§ 10.4.1 — Responsibility
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 10.4.1
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/06193e48-61ff-48c1-846d-50728de0f1c8
Section 10.4.1. - Responsibility.
A. Permit Required. No person shall conduct any land-disturbing activity within the city without first obtaining a site development permit from the Department of Engineering to perform such activity and providing a copy of Notice of Intent submitted to EPD if applicable, unless the activity is otherwise exempt from the soil erosion and sedimentation control provisions of the Land Development Activities Chapter of this UDO. B. Landowner, Developer and Consultants. The landowner, developer and designated planners and engineer shall review the general development plans and detailed plans of the City of Columbus, Georgia that effect the tract to be developed and the area surrounding it. They shall review the zoning ordinances, stormwater management ordinance, flood plain ordinance, subdivision regulations, this ordinance, and other laws and ordinances, which regulate the development of land within the boundaries of the City of Columbus, Georgia. However, the owner is the only party that can obtain a permit. C. Application for Development Permit. Any person seeking development activity on land within the city shall first submit to the Department of Engineering an application for a development permit, including all civil design and construction drawings required by this UDO. Any person seeking land-disturbing authorization without full development approval shall first submit an application including all civil design and construction drawings except the Street Improvement, Sewage Disposal and Domestic Water Supply Plans. D. Review of Site Development and Grading Permits. The Department of Engineering is responsible for administering the review and approval process for issuance of site development and grading permits. 1. Distribution. The Department of Engineering shall forward a copy of the permit application, including the civil design and constructions drawings for the project, to other City departments, the City Arborist, the Georgia DOT, or others as appropriate, for their review and comment. 2. Comments and Issuance of Permits. (A) The Department of Engineering shall provide all comments to the applicant for resolution, and shall issue the development permit when there is compliance by the application with all requirements of this UDO. (B) No development permit shall be issued prior to the approval of all other affected City departments, the Georgia DOT, the City Arborist or others as appropriate. E. Effect of Plan Approval. Approval of plans by the Engineering Department shall not imply or transfer acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture, or any other profession, from the professional, corporation, or individual under whose hand or supervision the plans were prepared. F. Effect of Inspections. The completion of inspections by the City and authorization for work continuation shall not transfer responsibility for the quality of the work performed or materials used from the owner, nor imply or transfer acceptance of responsibility for project design or engineering from the professional, corporation, or individual under whose hand or supervision the plans were prepared. G. Effect of Land Development or Grading Permit. A land development or grading permit shall not be interpreted to relieve any owner of the responsibility of maintaining full compliance with all codes, ordinances, and other regulations of the City. H. Issuance of Permits In Error. Any development permit issued in error or in contradiction to the provisions of this UDO shall be considered to have been null and void upon its issuance. I. Self-Permitting Authorized for Certain Actions. 1. Certificate of Self-permitting. (A) Application. Those builders of single-family residences covered under this Section, that provide a qualified, responsible person trained in soil erosion control measures and who can demonstrate the knowledge and ability to design, install and maintain soil erosion measures, may apply for a certificate for self-permitting for covered residential projects. (B) Definition of Qualified, Responsible Person. For the purposes of this Section a qualified, responsible person shall be an official or supervisor of the company with authority to implement or have implemented the necessary control measures. 2. Training for Self-permitting. The Department of Engineering provides an initial training session to assist applicants for self permitting in order to gain some of the necessary knowledge and ability to design, install and maintain soil erosion control measures. Qualified persons who attend the training session will be provided a certificate by the Department of Engineering. J. Liability. 1. Liability Not Imposed. The approval of an erosion and sediment control plan or other plans under the provisions of this Article, the issuance of a land development permit, or the compliance with the provisions of this UDO shall not relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the City or the Soil and Water Conservation Commission District for damage to any person or property. 2. Presumption of Violation not Created. The fact that any activity for which a land development has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this UDO or the terms of the permit. 3. Violation of State Requirements Not Permitted. Any provision of this UDO shall not permit any person to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or rules and regulations promulgated and approved thereunder or pollute any water of the state as defined thereby.
(Ord. No. 10-35, § 1, 7-13-10)
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.
