§ 10.4.5 — Process for Approval of Development Permit

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 10.4.5

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/bfdd8b66-e150-4cd7-8d4f-a2f861a0ef38

Section 10.4.5. - Process for Approval of Development Permit.

An application for a land development permit may proceed simultaneously with an application for a preliminary subdivision plat or site plan, but may not be issued prior to project approval of such plat or plan by the Planning Department, or prior to approval of the Landscaping, Buffers and Tree Protection plan by the City Arborist. A. General Requirements. 1. Application Requirements. An application for a land development shall include: (A) Application on the form furnished by the Engineering Department; (B) Three copies of the applicable civil design and construction drawings prepared in conformance with the specifications and standards in this UDO; (C) Preliminary plat or site plan requesting or reflecting project approval by the Planning Department, if applicable; (D) Payment of any land development permit fee, as established from time to time by the City Council; and (E) Additional requirements as specified by each type of permit, as stated below. 2. Other Agency Approval. The applicant may be required by the Engineering Department to secure development approval from other agencies if they are affected by the development. Development approval may be required from but not limited to: (A) The City Arborist; (B) Fire Department; (C) Muscogee County Health Department; (D) Georgia DOT; (E) Georgia Department of Natural Resources; (F) US Army Corps of Engineers; or (G) US Environmental Protection Agency. 3. Comments on Applications. Upon receipt of comments from other City departments, the Engineering Department shall indicate on a copy of the civil design and construction drawings or in writing all comments related to compliance with this UDO, conditions of zoning approval, and other regulations under the purview of the City, as appropriate. 4. Forwarding of Comments. The Engineering Department shall forward to the applicant the City's review comments. 5. Compliance. The applicant shall be responsible for compliance with all codes, regulations, and zoning requirements and for the satisfaction of all of the comments of the Planning Division. The owner shall also be responsible for obtaining approval from all other agencies affected by the project prior to issuance of the permit. 6. Decision on UDP and MLD Permit Applications. Applications for UDP and MLD will be approved or denied as soon as practical but not later than 15 working days after the application is filed. 7. Decision on SDP Permit Applications. Applications for SDP will be approved or denied as soon as practical but not later than 15 working days after the application is filed. 8. Minor Changes. Minor changes, revision notes or additions may be made by the reviewer upon the plans, if required for approval, notes shall be part of the approval permit. 9. Distribution of Copies. Two copies of the approved plan shall be returned to the applicant; one of which shall be retained on site by the construction crew performing the activity. B. Specific Requirements by Permit. Specific application requirements for each type of development permit are indicated below. 1. Reserved. 2. Utility Development Permit (UDP). (A) Applicability. Utility construction, as part of a larger development, such as a subdivision or industrial park, shall require a utility development permit (UDP). An application for a UDP shall include: (1) A location plan; and (2) Data to define the scope, location and narrative description of control measures to be taken, including a statement that compaction of trench backfill shall be equal to or greater than the density of adjacent soil and means of re-establishing vegetative stabilization. 3. Site Development Permits (SDP). (A) Applicability. A site development permit shall be required for all nonexempt land disturbing activities other than those requiring MLD or UDP permits. (B) SDP Application Requirements. (1) An application for the SDP shall be submitted to the Department of Engineering, along with three sets of the Site Development plan including the Soil Erosion and Sediment Control Plan, with supporting data, as necessary. Said plans shall include as a minimum, the data specified in Section 10.5.2. of this Chapter and shall conform to the provisions of the Soil Erosion and Sedimentation Control Article of Chapter 8 of this UDO. All applications shall contain a certification that the plan preparer or the designee thereof visited the site prior to creation of the plan or that such a visit was not required in accordance with rules and regulations established by the board. Prior to the approval of the application, a copy of the NOI, General Permit Fee Forms for EPD and the City along with proof of payment of all fees. Upon approval of the application, a minimum of eight sets shall be provided. One stamped approved set shall be kept on the project site at all times. (2) A fee in the amount as set by the City Council from time to time, pursuant to Chapter 12 of this UDO. (3) In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A. § 12-5-23(a)(5), provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity include in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8, half of such fees levied shall be submitted to the EPD; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. § 12-7-17(9) or (10) shall be submitted in full to the EPD, regardless of the existence of a local issuing authority in the jurisdiction. Since Columbus, Muscogee County has been designated, as a local issuing authority, $40.00 per acre of land disturbing activity calculated to the nearest one-tenth of an acre shall be paid to Columbus-Muscogee County. The other $40.00 per acre of land disturbing activity shall be paid to EPD. (C) Action on SDP Application. (1) A SDP application will be approved or denied as soon as practical but not later than 15 business days after application, and supporting data, is filed with the Engineering Department. If the application approval is denied, the reason for denial shall be furnished to the applicant. (2) No permit shall be issued by the Local Issuing Authority unless the erosion and sedimentation control has been approved by the District and the Local Issuing Authority has affirmatively determined that the plan is in compliance with this ordinance, and any variances required from stream buffer requirements of the Environmental Protection Chapter are obtained, bonding requirements, if necessary as per Section 10.4.7., are met and all ordinances and rules and regulations in effect with the jurisdictional boundaries of the Local Issuing Authority are met. If the permit is denied, the reason for denial shall be furnish to the applicant. (D) Phased Projects. If a tract is to be developed in stages, a separate permit shall be required for each stage. (E) Application Process. Immediately upon receipt of an application and plan for a permit, the Local Issuing Authority shall refer the application and plan to the Soil and Water Conservation District for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. The District shall approve or disapprove a plan within 35 days of receipt. Failure of the District to act within 35 days shall be considered an approval of the pending plan. The results of the District review shall be forwarded to the Issuing Authority. No permit will be issued unless the plan has been approved by the District, and any variances required from stream buffer requirements of the Environmental Protection Chapter have been obtained. Such review will not be required if the Issuing Authority and the Soil and Water Conservation District have entered into an agreement which allows the Issuing Authority to conduct such review and approval of the plan without referring the application and plan to the District. (F) Violations. The permit may be suspended, revoked, or modified by the Local Issuing Authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this ordinance. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit. (G) Approval Voided. Approval of an application shall be void one year from approval date if no activity is commenced upon the site to allow issuance of a site development permit. This time may be extended if a written request is received by the City Engineer prior to expiration and it determines site conditions have not changed. If any ordinances are revised or additional ordinances added during that time frame then applicant must modify the plans to meet the new requirements. 4. Minor Land Disturbing Activities Permit (MLD). (A) Minor Land Disturbing Activities Permits may be issued for a construction project that requires 2 weeks and less for completion and involves ⅛ acre or less of disturbed area. (B) MLD Application. (1) Eight copies of a site plan, as prepared for the building permit application, shall be submitted to the Department of Engineering. The plan shall show as a minimum, the location and type of temporary control measures, existing and proposed drainage facilities, existing buildings, easements, paving, etc., and narrative designating any necessary permanent stabilization. (2) A fee in the amount as set by the City Council from time to time, pursuant to Chapter 12 of this UDO, shall be charged. (C) Action on MLD Application. (1) A MLD will be approved or denied as soon as practical but not later than 15 business days after the application if filed with the Department of Engineering. Minor changes, revisions, notes or additions may be made by the reviewer upon the plans, if required for approval, and such shall be a part of the approved permit. (2) Four copies of the approved plan shall be returned to the applicant, of which one copy will be submitted to the building permit section.

(Ord. No. 09-16, § 1, 4-3-09)