For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.5.2 — Erosion and Sediment Control Plan

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 10.5.2

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/0412d9c7-9744-41f2-ad4f-d7ece0ceb4b8

Section 10.5.2. - Erosion and Sediment Control Plan.

A. Compliance. Plans must be prepared to comply with the erosion and sedimentation control requirements using best management practices as provided in Chapter 8. 1. Design Criteria. Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the Georgia Soil and Water Conservation Commission as a guide; or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. 2. Plan Considerations. The erosion and sediment control plan shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and storm water management facilities, local ordinances and State laws. B. Obtaining a Permit. A permit can only be obtained by the owner of the property. C. Requirement for Site Development Permit. A site development permit shall be required for all nonexempt land disturbing activities other than those requiring UDP or MLD permits. D. Data Required for Erosion and Sediment Control Plan. 1. Narrative or Notes, and Other Information. Notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes, including the notations listed below. All notes and other information as required under the State General Permit shall also be provided on the plans. (A) Installation of Control Measures. Clearing, grading, excavation, filling or other land disturbing activities shall not be permitted until approved erosion and sediment control measures have been installed, except those operations needed to install such measures. (B) Notification. The Department of Engineering shall be notified 24 hours prior to commencing any activity, and when such measures are ready for inspection. (C) Application of Control Measures. These erosion and sedimentation control measures shall apply to all features of the construction site, including, but not limited to, street and utility installations as well as the protection of individual lots. 2. Existing and Proposed Land Uses. Description of existing land use at project site and description of proposed project. 3. Identification of Property Owner. Name, address, and phone number of the property owner. 4. Identification of Local Contact. Name and phone number of 24-hour local contact who is responsible for erosion and sedimentation controls. 5. Size. Size of project, or phase under construction, in acres. 6. Schedule of Activity. Activity schedule showing anticipated starting and completion dates for the project. Include the statement in bold letters, that: "the installation of erosion and sediment control measures and practices shall occur prior to or concurrent with land-disturbing activities." 7. Storage Capacity. Stormwater and sediment management systems storage capacity, hydrologic study, and calculations, including off-site drainage area and maintenance schedule. 8. Vegetative Plan. Vegetative plan for all temporary and permanent vegetative practices, including species, planting dates, and seeding, fertilizer, lime and mulching rates. The vegetative plan should show options for year-round seeding. 9. Details. Detail drawings for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia. 10. Maintenance Statement. Maintenance statement, as follows: "Erosion control measures will be maintained at all times. Additional erosion and sediment control measures and practices will be installed if deemed necessary by on-site inspection." If full implementation of the approved plan does not prove for effective erosion and sediment control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source. 11. Location of State Waters. State waters within 200 feet of any part of the project and the 200-foot line. 12. Easements. Existing and proposed easements. 13. Sediment Control. A description of the sediment control program and sediment control practices. 14. Topographic and Soil Conditions. An adequate description of general topographic and soil conditions of the tract as available from the Pine Mountain Soil and Water Conservation District. 15. Maintenance Program. A description of the maintenance program for sediment control facilities including inspection programs, vegetative establishment of exposed soils, method and frequency of removal and disposal of solid waste material removed from control facilities and disposition of temporary structural measures. E. Data required for site plan shall include all the information required from the appropriate Erosion, Sedimentation and Pollution Control Plan Review Checklist established by the Commission as of January 1 of the year in which the land-disturbing activity was permitted. F. Maintenance. 1. Responsibility for Maintenance. Maintenance of all soil erosion and sediment control practices, whether temporary or permanent, shall be at all times the responsibility of the property owner. 2. Maintenance During Construction. All erosion and sediment control measures shall be continuously maintained by the developer/owner during the construction phase of the development and until permanent stabilization of ditches, shoulders, slopes and all disturbed areas is accomplished to eliminate the need for the temporary control measures which shall then be removed by same.

(Ord. No. 09-16, § 1, 4-3-09; Ord. No. 10-35, § 1, 7-13-10)

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.