Section 10.5.5. - Site Development Permit.
A. Site Development Permit Required. A site development permit is required for all developments, except for those specifically exempted in this UDO and shall include a stormwater management plan. B. Submission of Plan. 1. Review and Approval. In order to obtain a site development permit, a stormwater management site plan showing the design of the development shall be provided to the Department of Engineering for review and approval. 2. Effect on Permits. A development permit, building permit or land disturbance permit shall not be issued without an approved stormwater management site plan. C. General Standards. All drainage facilities shall be included in a surface drainage plan and shall be so designed to serve the entire drainage area. No increase in peak discharge to existing streams or stormwater sewers shall be permitted unless calculations are submitted and approved showing that such increase will not adversely affect upstream or downstream conditions. D. Requirements for Proposed Improvements. The location and size of all proposed stormwater improvements shall be designed in accordance with the Georgia Stormwater Management Manual, Volume 2. E. Stormwater Management Site Plan Requirements. The stormwater management plan shall include the information listed below, as more specifically detailed in the Georgia Stormwater Management Manual, Volume 2. 1. Existing Conditions Hydrologic Analysis. (A) A topographic map of existing site conditions (minimum 2-foot contour interval) with the basin boundaries indicated. (B) Acreage, soil types and land cover of areas for each sub-basin affected by the project. (C) All perennial and intermittent streams and other surface water features. (D) All existing stormwater conveyances and structural control facilities. (E) Direction of flow and exits from the site. (F) Analysis of runoff provided by off-site areas upstream of the project site. (G) Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. 2. Post-Development Hydrologic Analysis. (A) A topographic map of developed site conditions (2-foot contour interval required) with the post-development basin boundaries indicated. (B) Total area of post-development impervious surfaces and other land cover areas for each sub-basin affected by the project. (C) Unified stormwater sizing criteria runoff calculations for water quality, channel protection, overbank flooding protection and extreme flood protection for each sub-basin. (D) Location and boundaries of proposed natural feature protection areas, such as natural buffers and tree protection areas (see the General Development Standards Chapter of this UDO), and primary and secondary conservation areas (see the Resource Conservation Chapter of this UDO). (E) Documentation and calculations for any applicable site design credits that are proposed to be utilized. (F) Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. 3. Stormwater Management System. (A) Drawing or sketch of the stormwater management system including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls. This drawing is to show design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes. (B) Narrative describing that appropriate and effective structural stormwater controls have been selected. (C) Cross-section and profile drawings and design details for each of the structural stormwater controls in the system. This is to include supporting calculations showing that the facility is designed according to the applicable design criteria. (D) Hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs). (E) Documentation and supporting calculations showing that the stormwater management system adequately meets the unified stormwater sizing criteria. (F) Drawings, design calculations and elevations for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow. 4. Downstream Analysis. Supporting calculations for a downstream peak flow analysis using the ten-percent rule necessary to show safe passage of post-development design flows downstream. 5. Erosion, Sedimentation and Pollution Control Plan. The Stormwater Management Site Plan submission must be accompanied by an Erosion, Sedimentation and Pollution Control Plan prepared in accordance with Section 10.5.2. The erosion, sedimentation and pollution control plan must include: (A) All the elements specified in the Georgia Erosion and Sediment Control Act and local ordinances and regulations; (B) Sequence/phasing of construction and temporary stabilization measures; and (C) Temporary structures that will be converted into permanent stormwater controls. 6. Landscaping Plan. The Stormwater Management Site Plan submission must be accompanied by landscaping, buffer and tree protection plans prepared in accordance with Section 10.5.4. as applicable to the project. The landscaping, buffer and tree protection plans must include: (A) The arrangement of planted areas, natural areas and other landscaped features on the site plan; (B) Information necessary to construct the landscaping elements shown on the plan drawings; and (C) Descriptions and standards for the methods, materials and vegetation that are to be used in the construction. 7. Operations and Maintenance Plan. Description of maintenance tasks, responsible parties for maintenance, funding, access and safety issues. 8. Evidence of Acquisition of Applicable Local and Nonlocal Permits. Such evidence shall include a copy of the Notice of Intent (NOI) form submitted to DNR under General Permit No. GAR100000 (relating to authorization under NPDES for stormwater discharges associated with construction activity). 9. Waiver Requests (if any). Waivers from the provisions of the Georgia Stormwater Management Manual will be considered by the Engineering Department on a case-by-case basis. Waivers may be granted only when a requirement is shown to be impractical or having no benefit on adequate stormwater management of the site, or for an alternative approach that will have greater benefit and practicality than that otherwise required. See also Special Exception Variances, Section 10.11.4.C.2(A).
(Ord. No. 09-16, § 1, 4-3-09)
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.