§ 13-283 — Permit conditions
Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 13-283
Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/a7886f69-d12c-41e1-aeee-3f4684febbd4
Sec. 13-283. - Permit conditions.
Wastewater discharge permits shall be expressly subject to all provisions of the division and all other applicable ordinances, laws and regulations. Permits may contain the following: (a) The unit charge or schedule of user charges and fees for the wastewater to be discharged to a public sewer; (b) Limits on the average and maximum wastewater constituents and characteristics based on applicable pretreatment standards; (c) Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization; (d) Requirements for installation and maintenance of inspection and sampling facilities; (e) Self-monitoring, sampling, reporting, notification and record-keeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency and sample type based on federal, state or local law; (f) Compliance schedules; (g) Requirements for submission of technical reports or discharge reports; (h) Requirements for retaining plant records relating to wastewater discharge; (i) Requirements for notification of the Columbus Water Works of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the wastewater treatment system; (j) Requirements for notification of slug discharges; (k) Requirements for the installation of facilities or procedures to prevent and control accidental discharge or spills at the user's premises; (l) Requirement of a spill prevention/contingency plan; (m) Requirements for notification of any by-passes around pretreatment systems; (n) Other conditions as deemed appropriate by the Columbus Water Works to ensure compliance with this division; (o) Statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state or local law. (p) Statement of permit duration as specified in section 13-284 of this division; (q) Statement of non-transferability as specified in section 13-285 of this division; Prior to issuing a discharge permit, a draft permit will be sent to the user (certified mail-return receipt requested) which will show the conditions and discharge limitations. The user will be allowed 30 days to show cause why the conditions of this permit should not be required.
(Ord. No. 04-74, § 8(8.3), 8-17-04)
Ask a question about Columbus law
Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.
