For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13-287 — Inspection and sampling

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 13-287

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/5934db55-e62c-46a0-b516-6c4435c0a56a

Sec. 13-287. - Inspection and sampling.

The Columbus Water Works shall inspect the facilities of any user to ascertain whether the purposes of this division are being met and all requirements are being complied with. Persons or occupants of premises where wastewater is created or discharged shall allow the Columbus Water Works and its representatives, the Environmental Protection Division (EPD) of the Department of Natural Resources and the U.S. Environmental Protection Agency (EPA) ready access at all reasonable times to all parts of the premises for the purposes of inspection, testing, sampling, records examination or in the performance of any of their duties. The Columbus Water Works shall have the right to set up on the user's property such devices as are necessary to conduct sampling, inspection, testing, compliance monitoring, and/or metering operations. Where a user has security measures in force, which require proper clearance before entry into their premises, the user shall make necessary arrangements so that personnel from the Columbus Water Works, EPD, or EPA will be permitted to perform their specific responsibilities and to exercise the rights and authorities herein provided.

(Ord. No. 04-74, § 8(8.7), 8-17-04)

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.