For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-64 — Responsibility and liability

Code of Columbus, Georgia (Supp. No. 77, Update 1: codified through Ordinance No. 26-047, adopted September 22, 2026) · Columbus, Ga., Code § 18-64

Corpus is an independent public-information project, not the official City of Columbus website. Stable reference: corpuslaw.us/code/07ce87f1-8636-4413-8eb5-07c725ddc433

Sec. 18-64. - Responsibility and liability.

(a) The utility company is responsible for maintaining warning devices and barricades on all utility cut projects until the cut is either permanently or temporarily repaired and opened to traffic. The warning devices shall be placed in accordance with Section 159 of the department of transportation's "Standard Specifications—Construction of Roads and Bridges," or latest revisions. The following exceptions are permitted for placement of advance construction site signing, which must begin: (1) 500 feet before construction sites or at the nearest intersection on streets whose posted speed limit is less than but not including 40 miles per hour; or (2) 1,000 feet before construction site on streets whose posted speed limit is 40 miles per hour or greater, but not including 50 miles per hour; or (3) 1,500 feet before construction sites on streets with posted speed limits of 50 miles per hour or greater. (b) Each utility company shall furnish an emergency number where a responsible representative of the company can be reached after working hours and on weekends or holidays. This number shall be furnished to the directors of engineering, public works, and 911. The utility company shall be responsible for responding to emergencies promptly. (c) Each utility company will be totally responsible for maintenance of utility cut on right-of-way for 12 months. The required maintenance period shall expire on the last day of the month, one year from the month in which the final repair of the utility was made. (d) Utility companies shall repair all open cuts immediately following completion of construction with temporary patching material. Permanent patching material shall be placed no later than 30 calendar days following completion of temporary patch. The department of engineering shall be notified upon completion of permanent patching. Variances may be issued by the city engineer. (e) Any damage or claim of damage from the general public due to utility repair or installation operations shall be the responsibility of the utility company. (f) All utility companies shall be held responsible for insuring that all cuts are satisfactorily completed. Failure to comply will result in nonissuance of further permits. (g) The utility companies shall be responsible for scope and quality of work performed by their subcontractors. Subcontractors shall be licensed in Columbus, bonded and insured.

(Ord. No. 82-98, 12-28-82)

Ask a question about Columbus law

Corpus searches the Columbus sections it holds and shows the ones that match, with their citations. Free, no sign-in.