Sec. 18-73. - Inspections.
(a) Existing buildings inspections. Before issuing a permit, the building official may examine or cause to be examined any building, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the technical codes. (b) Manufacturers and fabricators. When deemed necessary by the building official he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the technical codes. (c) Inspection service. The building official may make, or cause to be made, the inspections required by this section. He may accept reports of inspectors of recognized inspection services provided that after investigation he is satisfied as to their qualifications and reliability. A certificate called for by any provision of the technical codes shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service. (d) Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required and a final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion. Site inspections and approvals shall be performed by the environmental specialist and final approval shall be completed and received by the building official prior to the issuance of the certificate of occupancy or completion. (e) Posting of permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or his representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official. The building permit shall be on the job site within ten days after the permit is received and before any inspections are requested. The building permit shall contain the following text: "The issuance of this permit authorizes improvements of the real property designated herein which improvements may subject such property to mechanics' and materialmen's liens pursuant to Part 3 of Article 8 of Chapter 14 of Title 44 of the Official Code of Georgia Annotated. In order to protect any interest in such property and to avoid encumbrances thereon, the owner or any person with an interest in such property should consider contacting an attorney or purchasing a consumer's guide to the lien laws which may be available at building supply centers." (f) Required inspections. The building official upon notification from the permit holder or his agent shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical codes. (1) Building. a. Footing/foundation inspection: To be made after trenches are excavated and forms erected. b. Frame inspection: To be made after the roof, all framing, fireblocking and bracing is in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete. c. Final inspection: To be made after the building is completed and ready for occupancy. This will include a site inspection by the Environmental Specialist and approval. (2) Electrical. a. Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. b. Rough-in inspection: To be made after the roof, framing, fireblocking and bracing is in place, and prior to the installation of wall or ceiling membranes. c. Meter set: To be made for temporary power prior to final occupancy of the building to allow for the starting up and testing of equipment. d. Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected, and the structure is ready for occupancy. (3) Plumbing. a. Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. This inspection shall require a pressure test on all underground sanitary drain lines. b. Rough-in inspection: To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping is complete and prior to the installation of wall or ceiling membranes. This inspection shall require a pressure test on all drain and water lines. c. Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. (4) Mechanical. a. Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. b. Rough-in inspection: To be made after the roof, framing, fireblocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. c. Final inspection: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. (5) Gas. a. Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. b. Meter set: To be made for temporary gas service prior to final occupancy of the building to allow for the starting up and testing of equipment. This inspection shall include a pressure test. c. Final inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to insure compliance with all the requirements of this Code, and to assure that the installation and construction of the gas system is in accordance with reviewed plans. (g) Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing five inspections. (h) Reinforcing steel and structural frames. Reinforcing steel or structural frame work of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official. (i) Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be applied until the release from the building official has been received.
(Ord. No. 2006-06, § 1(18-40), 2-21-06)
Ask a question about Kennesaw law
Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.