§ 6.00.04 — Street Repair; Utility Placement, Excavation Cut and Engineering Details
Code of Ordinances of the City of Kennesaw, Georgia (Codified through Ordinance No. 2026-06, enacted March 2, 2026. (Supp. No. 37)) · Kennesaw Municipal Code, App. A, ch. 6, § 6.00.04
Corpus is an independent public-information project, not the official City of Kennesaw website. Stable reference: corpuslaw.us/code/bf557515-7d49-40c2-8ae5-252189609c93
6.00.04 - Street Repair; Utility Placement, Excavation Cut and Engineering Details
A. When any part of any street, sidewalk, alley or other public place of the City shall be torn or dug up for any purpose, the person making that excavation, or opening shall have the duty of refiling the excavation or opening so as to restore it to essentially the same condition that existed prior to the excavation or opening. Any person neglecting, refusing or failing to comply with any provision of this section shall be guilty of a violation thereof; and where any neglect, refusal or failure is continued, after notice from the public works department, every day's continuance thereafter shall constitute a separate and distinct offense. B. The following specifications shall be used for asphalt and fill dirt reparations of all City streets and public properties after any excavations have been made, including all utilities. [image omitted; see the official code] 1. Trenches shall be excavated to a width not to exceed 12 inches on each side of the pipe diameter of 24 inches or less and not to exceed 15 inches on each side of the pipe for pipe diameters greater than 24 inches. Trench walls shall be as nearly vertical as possible. 2. Backfill shall be dense graded aggregate or sand. Dense graded aggregate shall be placed in maximum six-inch loose lifts and mechanically compacted. Sand may be compacted by placing in maximum 12-inch loose lifts and then flooded or jetted in place where satisfactory drainage is provided for free water. 3. Backfilling up to sub grade elevation shall be completed prior to excavation for the additional 12 inches of concrete on each side of the trench. 4. The applicant will be held responsible during the ensuing five years for proper backfilling and replacement of surface. During the five-year period after the cut is made, any pavement settlement shall be immediately repaired in an approved manner at the expense of the applicant. 5. Concrete pavements shall be repaired in the same manner as described in this section except that the thickness of concrete shall be the same as the surrounding pavement.
(Ord. No. 2018-21, § 1(Exh. A), 10-15-18)
Ask a question about Kennesaw law
Corpus searches the Kennesaw sections it holds and shows the ones that match, with their citations. Free, no sign-in.