For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-42 — Drainage

Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 25-42

Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/c2da2f73-328f-43f5-a1f8-bcd460ad6560

Sec. 25-42. - Drainage.

Where a subdivision is traversed by a watercourse, drainageway, channel, or stream, there shall be provided a stormwater easement or drainage right-of-way conforming substantially with the lines of such watercourse, and such further width or construction, or both, as will be adequate for the purpose of drainage and maintenance, taking into account possible future development of higher land in the same drainage areas. The drainageway shall be piped when the engineer shall find that it is a hazard or that a continual maintenance problem might exist. The developer shall comply with all environmental requirements for permits required by state or federal agencies.

(Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)

Ask a question about Macon-Bibb County law

Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.