For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-48 — Water distribution systems

Code of Ordinances of Macon-Bibb County, Georgia (Supp. No. 21: codified through Ordinance No. O-26-0033, enacted July 21, 2026) · Macon-Bibb County Code § 25-48

Corpus is an independent public-information project, not the official City of Macon-Bibb County website. Stable reference: corpuslaw.us/code/620b7427-1b9e-4beb-b557-eb9e2f539b19

Sec. 25-48. - Water distribution systems.

All new water distribution systems to be located in a new subdivision will be designed and installed in accordance with specifications adopted by the Macon Water Authority. Approval of a water distribution system by the authority is required prior to submission of engineering construction drawings to the engineer's office. Evidence of approval is required. Water mains and laterals shall be compacted in accordance with the Local Subdivision Design Manual.

(Ord. No. O-19-0065, § 1(Exh. B), 10-1-2019)

Ask a question about Macon-Bibb County law

Corpus searches the Macon-Bibb County sections it holds and shows the ones that match, with their citations. Free, no sign-in.