10.4.7. - Plans and Evidence of Compliance
A. The applicant for any permit required by any provision of the laws of the City of Roswell in connection with proposed work involving outdoor lighting fixtures must submit, as part of the application for permit, evidence that the proposed work will comply with this Section. Even should no other permit be required, the installation or modification, except for routine servicing and same-type lamp replacement of any exterior lighting, will require submission of the information described below. The submission must contain but is not necessarily limited to the following, all or part of which may be part or in addition to the information required elsewhere in the laws of the City of Roswell upon application for the required permit: 1. Plans indicating the location on the premises of each illuminating device, both proposed and any already existing on the site. 2. Description of all illuminating devices, fixtures, lamps, supports, reflectors, both proposed and existing. The description may include, but is not limited to catalog cuts and illustrations by manufacturers. 3. Photometric data, such as that furnished by manufacturers or similar, showing the angle of cut off of light emissions. B. Additional Submission. The above required plans, descriptions and data must be sufficiently complete to enable the Department to readily determine whether compliance with the requirements of this Section will be secured. If such plans, descriptions and data cannot enable this ready determination, the applicant must submit additional evidence of compliance to enable such determination, such as certified reports of tests, provided that the tests have been performed and certified by a recognized testing laboratory. C. Subdivision Plats. All new subdivided properties must submit information as described above for installed street lights and other common or public area outdoor lighting. D. Certification. For all projects, certification that the lighting as installed conforms to the approved plans shall be provided by an illumination engineer/professional before the Certificate of Occupancy is issued. Until this certification is submitted, approval for use by the issuance of the Certificate of Occupancy will not be issued. E. Reserved.
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.