§ 12.1.5 — Minimum Tree Density

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Unified Development Code § 12.1.5

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/7639fe09-70ea-4062-9c2f-f78373ebc172

12.1.5. - Minimum Tree Density

A. Minimum. All sites subject to the tree protection requirements, including all detached house or attached house lots 1 acre or greater in size, must maintain a minimum tree density, measured in units per acre. The term "unit" is an expression of basal area, and is not synonymous with "tree". The tree density requirement must be met whether or not a site has trees prior to development. FORMULA: Required Tree Density Units (Sec. 12.1.5.B.) - Existing Tree Density Units (Sec. 12.1.5.D.) = Replacement Tree Density Units B. Required Tree Density Units. Tree density units required vary based on the location of the site. Site Location | Tree Density Units Required Per Acre Downtown Historic Districts (-HOD) | 10 GA 400/Holcomb Bridge Node | 15 Estate, Suburban Residential | 20 All Other Character Areas | 30 C. Methods of Achievement. The minimum required tree unit density may be achieved by protecting existing trees and by planting new trees on the site. D. Calculation of Existing Tree Density. Required tree density units are calculated on the basis of total (gross) area of the site or lot in question, excluding existing easements that are required to be cleared of trees. Only existing trees of not less than 3 inches DBH left in good growing condition and protected in tree save areas on the site count toward the minimum required tree density units. Protected trees are eligible for tree density credit based on the following table. Existing Tree Size (DBH) | Tree Density Units 3" | 1.0 4" | 1.5 5" | 2.0 6" | 2.4 8" | 3.0 10" | 3.6 12" | 4.2 14" | 4.8 16" | 5.3 18" | 5.7 20" | 6.0 22" | 6.3 24" | 6.6 26" | 6.9 28" | 7.2 30" | 7.5 32" | 7.8 34" | 8.1 36" | 8.4 38" | 8.7 40" | 9.0 42" | 9.3 44" | 9.6 46" | 9.9 48" | 10.2 50" or more | 10.5 Sample Tree Unit Density Calculation FORMULA: Total Tree Density Units (Required Tree Density Units Per Acre from Sec. 12.1.5.B. × Site Acres) − Existing Tree Density Units Protected in Tree Save Areas = Replacement Tree Density Units (Required Density of Newly Planted Trees) EXAMPLE: Step 1: Calculate total requirement for your site. 2.2 acre site with a requirement of 30 tree density units per acre (see table in Sec. 12.1.5.B.) Total tree density units required is 66 (2.2 × 30) Step 2: Conduct a tree survey on your site. Calculate existing tree density units protected in a tree save area. A total of 8 existing trees will be protected in tree save areas on the site. 3 - 14" pines 3 - 18" oaks 1 - 20" hickory 1 - 30" oak Converted to tree density units using table. Tree Size (DBH) | Number of Trees | Tree Density Units (see Sec. 12.1.6.D) | TOTAL Tree Density Units 14" | 3 | 4.8 | 14.4 18" | 3 | 5.7 | 17.1 20" | 1 | 6.0 | 6.0 30" | 1 | 8.4 | 8.4 TOTAL | 45.9 Step 3. Calculate any tree density unit deficit by subtracting the existing protected tree density units from the total required. 66 tree density units required − 45.9 protected tree density units = 20.1 additional tree density units needed. Newly planted trees (Sec. 12.1.6) or a fee in lieu (Sec. 12.1.7) are required to make up any deficit. [image omitted; see the official code]

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.