For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 19.4.5 — Final Plat Specifications

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 19.4.5

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/04c6cbe3-79ce-485f-8a5f-fd2c8c171542

Section 19.4.5 - Final Plat Specifications.

The final plat shall conform to and meet the specifications of the approved preliminary plat with the following additions: (a) The final plat shall be clearly and legibly drawn in permanent ink on plastic vellum sheets of a size to be approved by the city engineer. Where more than one (1) sheet is required an index map shall be included on the same size sheet. (b) Accurate reference to the land lot system of Fulton County and when any part of the subdivision is within two thousand five hundred (2,500) feet of one (1) or more of the established geographic positions of the Plane Coordinate System of Georgia, the bearings or azimuths of the plane coordinate system shall be extended to and used in the subdivision and the coordinates, based on the Plane Coordinate System of Georgia, shall be shown at least on four (4) principal corners of said subdivision. (c) Exact boundary lines of the tract, determined by a field survey, giving distances to the nearest one-tenth-foot and angles to the nearest minute, which shall be balanced and closed with an error of closure not to exceed one (1) to five thousand (5,000). (d) Name of subdivision, exact location, widths, and names of all streets and alleys within and immediately adjoining the subdivision. Street numbers will be assigned to each lot in accordance with city requirements. (e) Central angles, radii, lengths of tangents, and arc distances of all curves. (f) Lot lines with dimensions to the nearest one-tenth-foot along with the bearings for said lines. (g) Lots numbered in numerical order and blocks lettered alphabetically. (h) Location, dimensions, and purposes of easements and areas to be reserved or dedicated for public use. (i) Accurate location, material and description of monuments and markers. (j) A statement, either directly on the plat or in an identified attached document of private covenants if any. (k) A note indicating that water and sanitary sewer lines are dedicated to the appropriate governing agency as required. (l) The following certifications: (1) The engineers or surveyors certificate of accuracy signed by the engineer or surveyor. CERTIFICATE OF SURVEYOR/ENGINEER It is hereby certified that this plat is true and correct and was prepared from an actual survey of the property made by me or under my supervision; that all monuments shown hereon actually exist or are marked as "Future", and their location, size, type and material are correctly shown; and that all engineering requirements of the "Land Subdivision Ordinance of the City of Roswell" and the requirements of the Unified Development Code (UDC) of the City of Roswell, Georgia" have been fully complied with. By: Registered Civil Engineer No. By: Registered Georgia Land Surveyor No. (2) Owners certification of ownership, intention to subdivide, and dedication to public use streets, alleys, easements and other public areas, signed by the owner. CERTIFICATE OF OWNER The owner of the land shown on this plat and whose name is subscribed thereto, and in person or through a duly authorized agent, acknowledges that this plat was made from an actual survey and dedicates to the use of the public forever, all streets, parks, drains, easements and public grounds thereon shown, which comprise a total of acres, for the purposes therein expressed. Subdivider: Owner: Date: Date: (3) Governing authority's acceptance of streets, alleys, easements and other public uses, as authorized by the mayor and council. FINAL APPROVAL _____ Mayor, City of Roswell Date _____ Engineer, City of Roswell Date The natural drains, branches, culverts and drainage structures shown on this plat are necessary for drainage of the subdivision and the City of Roswell will not be held responsible for overflow or erosion caused by them or for extension of culverts shown. Pursuant to the "Land Subdivision Ordinance of the City of Roswell," this plat was given final approval by the City of Roswell. (4) Certification by the Fulton County Health Department that the plat and proposed water and sewerage facilities are acceptable. (5) The mayor and city council's and city engineer's approval of the final plat, signed by the mayor and the city engineer. (6) Flood certification note: FLOOD HAZARD NOTE: Portions of this property do/do not lie within a 100-year flood hazard zone as defined by the F.E.M.A. Flood Insurance Rate Map of the City of Roswell, Georgia, Community Panel Number , dated NOTE: Disturbance of the 100-year floodplain is prohibited. (7) Note: Detention and/or water quality features that service this subdivision are maintained by the homeowners association and subject to the stormwater facilities BMP covenant on file with Fulton County and the City of Roswell.

(Ord. No. 2014-02-03, § 1, Amended 2/24/2014; 2003-12-30, Amended, 12/08/2003)

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.