§ 19.4.6 — Final Plat Approval

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 19.4.6

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/ad641437-ec21-476d-b186-377a8b856907

Section 19.4.6 - Final Plat Approval.

(a) Application for final plat approval. After the preliminary plat and the plans and specifications of a proposed land subdivision have been given approval by the planning commission and the City of Roswell, the subdivider may, within two (2) years from approval, submit to the mayor and city council: (1) A letter requesting review and approval of a final plat and giving the name and address of the person to whom the notice of the hearing by the mayor and city council on the final plat shall be sent. (2) Twenty-five (25) copies of the final plat and other documents as specified in section 19.4.5, the original and at least one (1) copy of which shall be drawn in permanent ink on plastic vellum. (3) Upon completion of the improvements required by these rules and regulations, the subdivider shall present to the city engineer one (1) complete set of the construction plans and drawings showing the subdivision and its improvements. This set of plans and drawings shall include: (A) "As built" plans of all streets and alleys showing the planned and actual location of all utility lines. (B) "As built" centerline profile of all streets where final grades vary from the approved plans. (C) Profiles and invert elevations of all storm and sanitary sewer lines as such improvements shall have actually been installed by the subdivider. (D) A letter submitted by a registered professional engineer and/or registered surveyor certifying that all sewers, storm drains, curbing and paving, have been placed according to grade stakes set by him or his representatives to conform to construction plans submitted to and approved by the city engineer. (E) "As built" drawings and certification by a registered professional engineer that the stormwater management system has been constructed in conformance with the construction plans submitted to and approved by the city engineer. However, no approval shall be given in connection with said final plat, or unit division thereof, until improvements are substantially completed, and the city engineer certifies that all required utilities installations have been paid for by the subdivider and that the subdivider has complied with one (1) of the following alternatives: (a) All utilities and other improvements have been installed in accordance with the requirements of these regulations. (b) A subdivider's performance bond, in an amount equal to one hundred twenty-five (125) percent of the cost of the infrastructure improvements not yet in compliance, shall have been filed by the subdivider in the office of the zoning administrator, said performance bond shall: (1) Be conditioned upon the faithful performance by the subdivider or developer of all incomplete work required to complete all improvements and installations for the subdivision, or unit division thereof, in compliance with these rules and regulations within a specified time. (2) Be payable to, and for the indemnification of the City of Roswell. (3) Be in an amount as set by the City of Roswell, sufficient to pay for all required improvements. (4) Be with surety by a company entered and licensed to do business in the State of Georgia. (5) Be approved by the zoning administrator or the city attorney. Additionally, the developer shall be required to provide a maintenance bond with the city and shall agree to maintain the streets rights-of-way for a period of one (1) year from acceptance of the streets by the city. The bond will be in the amount of one-third (⅓) of the estimated infrastructure construction cost, which may include but not be limited to paving, curbing, drainage and water lines with a minimum bond amount of $5,000.00. At the end of the one-year maintenance bond, the city engineer shall make a final inspection and notify the developer and bonding company of any corrections to be made. No building permit is to be issued until approval of the final plat by the mayor and city council. (b) Procedure for approval of final plat. The Roswell Mayor and City Council shall check the final plat for conformance with the approved preliminary plat and with the provisions of this chapter, and shall afford a hearing on the final plat, notice of time and place of which shall be sent by registered or certified mail to the person designated in the letter requesting final plat review and approval, not less than five (5) days prior to the date of the hearing. A notation of the mayor and city council's action shall be made on the original tracing and two (2) prints of the final plat, including a statement of the reasons therefor if the final plat is disapproved. If action on a final plat is not taken by the mayor and city council within forty-five (45) days of the date of the submittal of a completed application, the final plat shall be considered approved and a certificate of approval shall be issued on demand. However, the applicant for approval may waive this requirement and consent to an extension of time.

(Ord. No. 2014-02-03, § 1, Amended 2/24/2014; 2003-12-30, Amended, 12/08/2003)