§ 5.4.35 — Existing-Building Inspections
Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 5.4.35
Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/24a8c3f6-f76a-4f6f-ba84-76eca4faa6af
Section 5.4.35 - Existing-Building Inspections.
Before issuing a permit the chief building inspector may examine or cause to be examined any building, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the technical codes.
Ask a question about Roswell law
Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.
