For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5.4.39 — Required Inspections

Code of Ordinances of the City of Roswell, Georgia (Codified through Ordinance No. 2025-11-10, adopted November 10, 2025. (Supp. No. 17)) · Roswell Code of Ordinances § 5.4.39

Corpus is an independent public-information project, not the official City of Roswell website. Stable reference: corpuslaw.us/code/bcb01a34-2827-46b4-8ad6-d926c0a9f8c5

Section 5.4.39 - Required Inspections.

The chief building inspector upon notification from the permit holder or his agent shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical code: (a) Building: (1) Footing/Foundation/Foundation Wall Inspection: To be made after trenches are excavated, the reinforcement in place, and the forms erected, prior to the placing of concrete. (2) Slab/Monolithic Slab Inspection: To be made prior to the placing of concrete. (3) Frame Inspection: To be made after the roof, all framing, fire blocking and bracing, are in place, all concealed wiring, all pipes, chimneys, ducts and vents are complete. (4) Moisture Barrier Inspection: To be made prior to the installation of the exterior finish material. (5) Final Inspection: To be made after the building is completed and ready for occupancy. (b) Electrical: (1) Temporary Pole: To be made after the temporary power pole has been placed, properly grounded and ready to be energized. (2) Underground Inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. (3) Rough-In Inspection: To be made after the roof, framing, fire blocking and bracing is in place and prior to the installation of wall or ceiling-membranes. (4) Final Inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy. (c) Plumbing: (1) Underground Inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. (2) Rough-In Inspection: To be made after the roof, framing, fire blocking and bracing is in place and all soil, waste and vent piping is complete, and prior to this installation of wall or ceiling membranes. (3) Final Inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. (4) Required Tests: Tests performed as required by code. (d) Mechanical: (1) Underground Inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. (2) Rough-In Inspection: To be made after the roof, framing, fire blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. (3) Final Inspection: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. (e) Gas: (1) Rough Piping Inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. (2) Final Piping Inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. (3) Final Inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to insure compliance with all the requirements of this Code and to assure that the installation and construction of the gas system is in accordance with reviewed plans. (f) Energy: (1) Foundation Inspection: To be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required. (2) Frame Inspection: To be made before exterior wall insulation is concealed by wall board to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage. (3) Final Inspection: To be made after the building is completed and ready for occupancy. To verify installation and R-value of ceiling and floor insulation. A completed energy code compliance certificate shall be installed in or near the electrical panel as required by code.

(2012-08-13, § 9, Amended, 08/27/2012)

Ask a question about Roswell law

Corpus searches the Roswell sections it holds and shows the ones that match, with their citations. Free, no sign-in.