§ 6.1.2 — Building Placement
Code of Ordinances of the City of Sandy Springs, Georgia (Codified through Ordinance No. 2026-03-006, enacted March 17, 2026 (Supp. No. 24)) · Sandy Springs Development Code § 6.1.2
Corpus is an independent public-information project, not the official City of Sandy Springs website. Stable reference: corpuslaw.us/code/823fa813-5f62-49e5-b5f5-7a9b4cc368a4
Sec. 6.1.2. - Building Placement
A. Building Setbacks 1. Type of Setbacks There are 4 types of setbacks: primary street, side street, common side and rear. Building setbacks apply to both principal and accessory buildings or structures except where this Development Code explicitly states otherwise. [image omitted; see the official code] 2. Measurement of Building Setbacks a. A primary street setback is measured at a right angle (perpendicular) to the primary street lot line. b. A side street setback is measured at a right angle (perpendicular) from the side street lot line. c. A rear setback is measured at a right angle (perpendicular) to the rear property line or the rear lot line. d. All lot lines which are not primary street, side street or rear lot lines are considered common side lot lines for the purpose of measuring setbacks. Common side setbacks are measured at a right angle (perpendicular) from the side lot line. e. All setbacks are drawn using an extension of a line perpendicular to the lot line until they intersect with another setback line. [image omitted; see the official code] f. Reserved. g. Where street right-of-way dedication occurs, all setbacks are measured from the final property line. 3. Irregularly-Shaped Lots The Director will determine how setbacks apply to irregularly-shaped lots. (See also Sec. 6.1.1 B.) 4. Irregular Rights-of-Way The Director may determine primary or side street setbacks will be measured from the back of curb when rights-of-way widths vary. B. Setback Encroachments All buildings and structures must be located at or behind the required setbacks, except as listed below. No building or structure can extend into a required buffer, easement (including private street easement) or public right-of-way. 1. Building Features a. All Setbacks. i. Building eaves, roof overhangs, gutters, downspouts, light shelves, bay windows, and oriels less than 10 feet wide, cornices, belt courses, sills, buttresses, or other similar architectural features may encroach up to 3 feet into a required setback, if such extension is at least 3 feet from the vertical plane of any lot line. [image omitted; see the official code] ii. Chimneys may encroach up to 4 feet into a required setback, if such extension is at least 5 feet from the vertical plane of any lot line. iii. Handicap ramps may encroach to the extent necessary to perform their proper function. iv. Balconies may encroach no more than 10 feet into a required setback, if such extension is at least 5 feet from the vertical plane of any lot line. Balconies are not required to be set back from lot lines in instances where a zero-foot setback is employed. v. Awnings/canopies may extend into a required setback if such extension is at least 3 feet from the vertical plane of any lot line. b. Primary and Secondary Street Setbacks. Porches, raised entries, and stoops, including steps, may encroach no more than 10 feet into a required setback, if such extension is at least 5 feet from the vertical plane of any lot line. c. Common Side and Rear Setbacks. Unenclosed patios, decks, terraces, or fire escapes may encroach into a common side or rear setback, provided that such extension is at least 5 feet from the vertical plane of any common side lot line and 10 feet from any rear lot line. d. Build-To Zones. Any building feature may be built as close to the minimum build-to line as is practically possible, taking into account considerations such as spacing necessary to install footings, utilities, and other subgrade or otherwise needed improvements. 2. Low Impact Stormwater Features a. Rain gardens, bioretention areas, and similar features, as determined by the Director, may encroach into a required setback, provided such extension is at least 3 feet from the vertical plane of any lot line. b. Rain barrels or cisterns of 6 feet or less in height may encroach up to 3 feet into a required setback, if such extension is at least 3 feet from the vertical plane of any lot line. These features are considered ground-mounted equipment and require screening per Sec. 8.3.9 B.4. 3. Mechanical Equipment and Utility Lines a. In Protected Neighborhood Districts, mechanical equipment such as HVAC units and generators cannot encroach into any required setback. b. In Urban Neighborhood Districts, mechanical equipment may encroach up to 5 feet into a required rear setback, if such extension is at least 5 feet from the lot line. No encroachment into side building setbacks is allowed. c. In any zoning district, mechanical equipment cannot encroach into a setback where the property line abuts a property zoned RE- or RD- that is used for residential purposes. d. In any zoning district other than described above, mechanical equipment may encroach into a required setback, if such extension is at least 5 feet from the lot line. e. In all instances, mechanical equipment must be screened (see Sec. 8.3.9) and may not be located between the primary building and a primary street, unless the lot meets the following exceptions. i. Where the primary building has multiple offsets in the street-facing façade, mechanical equipment must be located at least 15 feet behind the frontmost street-facing façade. ii. In Protected Neighborhoods where the primary structure is located more than 100 feet from primary street lot line, mechanical equipment can be located between the building and primary street so long as the equipment is screened with a masonry wall. C. Build-to Zone 1. The build-to zone (BTZ) is an area of a lot or site where building façades, in whole or in part, must be located to satisfy the required build-to percentage. The build-to zone is the area between a minimum and maximum primary or side street setback, measured from the edge of the right-of-way or private street easement. Freestanding walls and opaque fences over 42 inches in height are prohibited within any BTZ. Other walls or fences that are part of a landscape design prepared by a licensed landscape architect may be permitted by the Director. 2. Where the build-to zone lies within a stream buffer or easement that does not allow construction, or buffers or setbacks as required by zoning conditions, transitional buffers or otherwise, the Director may waive the build-to requirement, in whole or in part. 3. The required percentage specifies the amount of the building façade that must be located in the BTZ. The percentage is calculated as the width of the street-facing building façade in the BTZ divided by the total width of the street-facing building façade. Where a proposed building will not fill the entire street frontage of a site, the longer façade of the building must be street-facing. [image omitted; see the official code] 4. The width of a parking entrance into or through a building does not count towards the build-to requirement. However, in no case will access to an irregularly-shaped parcel that has no alternative access options be denied due to application of the build-to requirement. In all cases where access is necessary, a driveway of the minimum acceptable width for fire safety purposes is allowed, even where it reduces the building width below the required build-to percentage. 5. On a corner lot, a building must be placed within or abutting the area where the build-to zones of 2 intersecting streets overlap. The building must extend within the build-to zone for a minimum of 30 feet in both directions. If in neither direction, a proposed development has 30 feet of length, the building must be placed in the corner of the intersecting streets. [image omitted; see the official code] 6. The BTZ applies up to the height designated as the minimum height of a building. Upper stories beyond this point may be set further back or reduced in width. 7. The Director may allow a courtyard, plaza, or other similar pedestrian activated space meeting the requirements of pedestrian amenity space to be considered part of the building for the purpose of meeting the build-to requirement. A chamfered corner on the ground floor of no more than 20 feet in width that extends outside of the build-to zone is considered part of the building for the purpose of meeting the build-to requirement. [image omitted; see the official code] D. Build-to-Zone: New Buildings 1. All new buildings must be placed in the build-to zone until the required percentage for the entire lot or site has been met. [image omitted; see the official code] 2. Once the required percentage has been met for the entire lot or site, new buildings may be placed outside of the build-to zone. [image omitted; see the official code] E. Build-to Zone: Additions 1. Front Additions Any addition to the front of an existing building must be placed in the build-to zone. The addition does not have to meet the required percentage for the entire lot or site. Front additions no greater than 10% cumulatively of the existing building footprint are allowed outside of the build-to zone. [image omitted; see the official code] 2. Side Additions Side additions no greater than 20% cumulatively of the existing building footprint are allowed outside of the build-to zone. Once the required percentage for the entire lot or site has been met, side additions of any size are allowed. [image omitted; see the official code] 3. Rear Additions a. Rear additions are allowed outside of the build-to zone. [image omitted; see the official code] b. Rear additions on corner lots where the side street does not meet the build-to requirement must include additional street planting to screen the side street for the length of the existing and expanded building. The screening must consist of a 10-foot landscape strip planted with trees every 30 feet on center and landscaped with shrubs. [image omitted; see the official code] F. Parking Location 1. All parking spaces must be located consistent with the parking location requirements. 2. Where parking is allowed in a yard, it may be placed between the principal or accessory building and the lot line (but not in a required buffer), in accordance with the parking setback if applicable. G. Parking Setbacks 1. All parking spaces (surface and structured) must be located behind the parking setback line. 2. Parking below and covered by the ground may encroach into a required parking setback but must not extend into a required easement or the right-of-way or within 3 feet of any common side lot line. 3. The parking setback applies to the ground story only. 4. Parking setbacks are measured from the right-of-way, private street easement or property line. 5. Parking Structures a. Required parking setbacks apply only to the ground floor of the parking structure. b. In order to meet the parking setback requirement, parking structures must adhere to 1 of the following standards: i. The ground story of a structure parking garage facing any street (not including an alley), must have active uses (such as, but not limited to, residential, commercial, office, or civic space, where permitted) within the parking setback. No active uses are required for portions of the parking structure located behind the minimum parking setback; or [image omitted; see the official code] ii. The entire parking structure must be constructed to be adaptable, requiring the floor plates to be level except to the minimum extent required for drainage, the structure must be constructed to accommodate standard design loads of office uses according to the International Building Code, and the floor-to-floor heights must be a minimum of 12 feet. c. Parking structure screening is required (see Sec. 8.1.8 K).
(Ord. No. 2023-12-22, § I(Att. A), 12-5-2023)
Ask a question about Sandy Springs law
Corpus searches the Sandy Springs sections it holds and shows the ones that match, with their citations. Free, no sign-in.
