Sec. 8-1038. - Permits.

(a) Permit application. (1) When required. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical, or plumbing system, the installation of which is regulated by the minimum codes, or to cause any such work to be done shall first make application to the building official and obtain the required permit for the work. (2) Any owner, authorized agent, or contractor who desires to construct, enlarge, erect, install, alter, repair, move, remove, demolish, convert or replace any fire protection system or portion thereof, shall make application to the fire official and obtain the required permit for such activity prior to the commencing of said activity. A permit shall be obtained where required by the fire official and where referenced in either city ordinance, the International Fire Code, or as promulgated under the "Rules and Regulations of the Safety Fire Commissioner", Chapter 120-3-3, "Rules and Regulations for the State Minimum Fire Safety Standards." (3) Work authorized. A building, electrical, gas, mechanical or plumbing permit shall carry with it the right to construct or install the work, provided the same is shown on the drawings and set forth in the specifications filed with the application for the permit. Where these are not shown on the drawings and covered by the specifications submitted with the application, separate permits shall be required. (4) Minor repairs. Ordinary minor repairs may be made without a permit, provided that such repairs shall not violate any of the provisions of the minimum codes. (5) Information required. Each application for a permit, with the required fee, shall be filed with the building official on a form furnished for that purpose and shall contain a general description of the proposed work and its location. The application shall be signed by the owner or his authorized agent. The building permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure and shall contain such other information as may be required by the building official. (6) Time limitations. An application for a permit for any proposed work shall be deemed to have been abandoned six months after the date of filing for the permit, unless before then a permit has been issued. One or more extensions of time for periods of not more than 90 days each may be allowed by the building official for the application, provided the extension is requested in writing and justifiable cause is demonstrated. (b) Drawings and specifications. (1) Requirements. When required by the building official, two or more copies of specifications, and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work, shall accompany the application for a permit. Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the minimum codes. Such information shall be specific, and the minimum codes shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used, as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design. (2) Additional data. The building official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation, and the basis of calculations shall be prepared by an architect or engineer and affixed with their official seal. (3) Design professional. The design professional shall be an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications and accompanying data for the following: (i) All new or existing A, E, I, R occupancies. (ii) Buildings and structures two stories or more high. (iii) Buildings and structures 5,000 sq. ft. (465 m^2) or more in area. (iv) Exception: One- and two-family dwellings and domestic outbuildings, regardless of cost, shall require neither a registered architect or engineer, nor a certification that an architect or engineer is not required. (4) Structural and fire resistance integrity. Plans for all buildings shall indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistance wall, floor or partition will be made for electrical, gas, mechanical, plumbing, signal and communication conduits, pipes and systems and also indicate in sufficient detail how the fire integrity will be maintained where required fire resistance floors intersect the exterior walls. (5) Site drawings. Drawings shall readily identify and definitively locate the proposed building or structure and every existing building or structure on the site or lot. (6) Hazardous occupancies. The building official may require the following: (i) General site plan. A general site plan drawn at a legible scale which shall include, but not be limited to, the location of all buildings, exterior storage facilities, permanent accessways, evacuation routes, parking lots, internal roads, chemical loading areas, equipment cleaning areas, storm and sanitary sewer accesses, emergency equipment and adjacent property uses. The exterior storage areas shall be identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored. (ii) Building floor plan. A building floor plan drawn to a legible scale which shall include, but not be limited to, all hazardous materials storage facilities within the building and shall indicate rooms, doorways, corridors, exits, fire rated assemblies with their hourly rating, location of liquid tight rooms, and evacuation routes. Each hazardous materials storage facility shall be identified on the plan with the hazard classes and quantity range per hazard class or the hazardous materials stored. (c) Examination of documents. (1) Plan review. The building official shall examine or cause to be examined each application for a permit and the accompanying documents, consisting of drawings, specifications, computations, and additional data, and shall ascertain by such examinations whether the construction indicted and described is in accordance with the requirements of the minimum codes and all other pertinent laws or ordinances. (2) Affidavits. The building official may accept a sworn affidavit from a registered architect or engineer stating that the plans submitted conform to the minimum codes. For buildings and structures the affidavit shall state that the plans conform to the laws as to egress, type of construction and general arrangement and if accompanied by drawings showing the structural design, and by a statement that the plans and design conform to the requirements of the minimum codes as to strength, stresses, strains, loads and stability. The building official may without any examination or inspection accept such affidavit, provided the architect or engineer who made such affidavit agrees to submit to the building official copies of inspection reports as inspections are performed and upon completion of the structure, electrical, gas, mechanical or plumbing systems a certification that the structure, electrical, gas, mechanical or plumbing system has been erected in accordance with the requirements of the minimum codes. Where the building official relies upon such affidavit, the architect or engineer shall assume full responsibility for the compliance with all provisions of the minimum codes and other pertinent laws or ordinances. (d) Issuing permits. (1) Action on permits. The building official shall act upon an application for a permit without unreasonable or unnecessary delay. If the building official is satisfied that the work described in an application for a permit and the contract documents filed therewith conform to the requirements of the minimum codes and other pertinent laws and ordinances, he shall issue a permit to the applicant. (2) Refusal to issue permit. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the minimum codes or other pertinent laws or ordinances, the building official shall not issue a permit, but shall return the contract documents to the applicant with his refusal to issue such permit. Such refusal shall be in writing and shall contain the reason for refusal. (3) Special foundation permit. When application for a permit to erect or enlarge a building has been filed and pending issuance of such permit, the building official may, at his discretion, issue a special permit for the foundation only. The holder of such a permit shall proceed without assurance that the permit for the entire building or structure will be granted. (4) Public right-of-way . A permit shall not be given by the building official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections encroaching on any street, alley or public lane, except as provided for in chapter 32 of the Standard Building Code. (5) Suspension or revocation. The building official may, in writing, suspend or revoke a permit issued under the provisions of these codes whenever the permit is issued in error or on the basis of incorrect information supplied or in violation of any ordinance or regulation or any of the provisions of these codes. (e) Contractor's responsibilities. It shall be the duty of every contractor who shall make contracts for the installation or repairs of building, structure, electrical, gas, mechanical, sprinkler or plumbing systems, for which a permit is required, to comply with state or local rules and regulations concerning licensing which the applicable governing authority may have adopted. Where the state requires a contractor to have obtained a state license before they are permitted to perform work, the contractor shall supply the local government with their license number before receiving a permit for work to be performed. (f) Conditions of the permit. (1) Permit intent. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the minimum codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of this Code. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of six months after the time the work is commenced. One or more extensions of time, for periods not more than 90 days each, may be allowed for the permit. The extension shall be requested in writing and justifiable cause demonstrated. Extensions shall be in writing by the building official. (2) Permit issued on basis of an affidavit. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official, are hazardous or complex, the building official shall require that the architect or engineer who signed the affidavit or prepared the drawings or compilations shall supervise such work. In addition, they shall be responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the minimum codes. (3) Plans. When the building official issues a permit, he shall endorse, in writing or by stamp, both sets of plans "Reviewed for Code Compliance." One set of drawings so reviewed shall be retained by the building official, and the other set shall be returned to the applicant. The permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative. (g) Fees. (1) Prescribed fees. A permit shall not be issued until the fees prescribed by the City of Savannah have been paid. No amendment to a permit shall be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical or gas systems, has been paid. (2) Schedule of permit fees. On all buildings, structures, electrical, plumbing, mechanical and gas systems or alterations requiring a permit, a fee for each permit shall be paid as required at the time of filing application, in accordance with the fee schedules as set by the City of Savannah revenue ordinance. (3) Building permit valuations. If, in the opinion of the building official, the valuation of building, alteration, structure, electrical, gas, mechanical or plumbing systems appears to be underestimated on the application, the permit shall not be issued until the applicant can show detailed estimates to meet the approval of the building official. Permit valuations shall include total cost, such as electrical, gas, mechanical, plumbing equipment and other systems, including materials and labor. (4) Fee refunds. The building official may authorize refunding of any fee paid hereunder which was erroneously paid or collected. The building official may authorize refunding of not more than 80 percent of the permit fee when no work has been done under a permit issued in accordance with these codes. The building official shall not authorize refunding of any permit fee paid except on written application filed by the original applicant not later than 180 days after the date of fee payment. (h) Inspections. (1) Approvals. Approval as the result of an inspection shall not be construed to be an approval of a violation of the provisions of the minimum codes or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel provisions of this Code or of other ordinances of the jurisdiction shall not be valid. (2) Existing building inspections. Before issuing a permit the building official may examine or cause to be examined any building, electrical, gas, mechanical or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the minimum codes. (3) Manufacturers and fabricators. When deemed necessary by the building official he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the minimum codes. (4) Inspection service. The building official may make, or cause to be made, the inspections required by subsection (h)(6). He may accept reports of inspectors of qualified inspection services. A certificate called for by any provision of the minimum codes shall not be based on such reports unless the same are in writing and certified by an officer of such service. (5) Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion. (6) Posting of permit. Work requiring a permit shall not commence until the permit holder or his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official. (7) Required inspections. The building official upon notification from the permit holder or their agent shall make the following inspections: (i) Building. (a) Foundation inspection. To be made after trenches are excavated and forms erected. (b) Frame inspection. To be made after the roof, all framing, fire blocking and bracing are in place, and all concealed wiring, all pipes, chimneys, ducts and vents are complete. (c) Final inspection. To be made after the building is completed and ready for occupancy. (ii) Electrical. (a) Underground inspection. To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. (b) Rough-in inspection. To be made after the roof, framing, fire blocking and bracing are in place and prior to the installation of wall or ceiling membranes. (c) Final inspection. To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy. (iii) Plumbing. (a) Underground inspection. To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. (b) Rough-in/top-out inspection. To be made after the roof, framing, fire blocking and bracing are in place and all soil, waste and vent piping is complete, and prior to the installation of wall or ceiling membranes. (c) Final inspection. To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. Note: See section 417 of the Standard Plumbing Code for required tests. (iv) Mechanical. (a) Underground inspection. To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. (b) Rough-in inspection. To be made after the roof, framing, fire blocking and bracing are in place and all ducting and other concealed components are complete, and prior to the installation of wall or ceiling membranes. (c) Final inspection. To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. (v) Gas. (a) Rough piping inspection. To be made after all new piping authorized by the permit has been installed and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. This inspection shall include a pressure test. (b) Final piping inspection. To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed and before any fixtures or gas appliances have been connected. (c) Final inspection. To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to ensure compliance with all the requirements of this Code and to assure that the installation and construction of the gas system is in accordance with reviewed plans. (vi) Energy. (a) Foundation inspection. To be made before slab concrete is poured in place. To verify that perimeter insulation has been installed correctly on any slab on grade foundations, if required. (b) Frame inspection. To be made before exterior wall insulation is concealed by wallboard to check installation of exterior walls insulation and to inspect that all holes and cracks through the structure envelope have been sealed in an appropriate manner as to restrict air passage. (c) Final inspection. To be made after the building is completed and ready for occupancy. To verify installation and R-value of ceiling and floor insulation. To verify correct SEER ratings on appliances. (i) Fire code enforcement. (a) Due to the variety of permits issued by the office of the fire marshal, the specific type and schedule of inspections will be determined by the fire official at the time of permit issuance. These inspections may include, but are not limited to, inspections of: commercial burn sites prior to and during operation; partial inspections of fire alarms and fire sprinklers; cover up inspections; pressure test inspections; inspections of fire stopping in fire barriers, smoke barriers, and fire partitions; re-inspections after corrections; flow test inspections; and performance test inspections; partial inspections; and final inspections. (8) Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing three inspections. (9) Reinforcing steel, structural frames, insulation, plumbing, mechanical, or electrical systems. Reinforcing steel, structural frame, insulation, plumbing, work of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official. (10) Plaster fire protection. In all buildings where plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and backing is in place. Plaster shall not be applied until the release from the building official has been received. (i) Other inspections. In addition to the required inspections specified above, the building official may make or require other inspections of any construction work to ascertain compliance with the provisions of this Code and other laws which are enforced by the code enforcement agency. (Ord. of 3-12-1998(2), § 1; Ord. of 7-21-2016(3) )

Ask a question about Savannah law

Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.