§ 8-1039 — Certificates
Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 8, ch. 1., art. B, § 8-1039
Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/e08addea-1251-4685-9bba-3f2702df9c9a
Sec. 8-1039. - Certificates.
(a) Certificate of occupancy. (1) Building occupancy. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until the building official has issued a certificate of occupancy. Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the minimum codes and other applicable laws and ordinances and released by the building official. (2) Issuing certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the minimum codes, reviewed plans and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of the minimum codes. (3) Temporary/partial occupancy. The building official may issue a temporary/partial certificate of occupancy for a portion of a building which may safely be occupied prior to final completion of the building. (4) Existing building certificate of occupancy. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the minimum codes for the occupancy intended. The building official may require detailed drawings or a general inspection or both. When, upon examination and inspection, it is found that the building conforms to the provisions of the minimum codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued. (5) Revocation. The building official may, in writing, suspend or revoke a certificate of occupancy issued under the provisions of this Code whenever the certificate is issued in error or on the basis of incorrect information supplied or when it is determined that the building or structure of [or] portion thereof is in violation of any ordinance or regulation or any of the provisions of these codes. (b) Certificate of completion. Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing system, a certificate of completion may be issued. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy. (c) Service utilities. (1) Connection of service utilities. No person shall make connections from a utility, source of energy, fuel or power to any building or system which is regulated by the minimum codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued. (2) Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy. (3) Authority to disconnect service utilities. The building official shall have the power to authorize disconnection of utility service to the building, structure or system regulated by the minimum codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter. (d) Posting floor loads. (1) Occupancy. An existing or new building shall not be occupied for any purpose which will cause the floors thereof to be loaded beyond safe capacity. The building official may permit occupancy of a building for mercantile, commercial or industrial purposes, by a specific business, when he is satisfied that such capacity will not thereby be exceeded. (2) Storage and factory-industrial occupancies. The owner, agent, proprietor or occupant of group S and group F occupancies, or any occupancy where excessive floor loading is likely to occur, shall provide certification of the safe load capacity. All such certifications shall be accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed. (3) Signs required. In every building or part of a building used for storage, industrial or hazardous purposes, the safe floor loads, as reviewed by the building official on the plan, shall be marked on signs which shall be supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such signs shall not be removed or defaced and, if lost, removed or defaced, shall be replaced by the owner of the building. (e) Tests. The building official may require tests or test reports as proof of compliance. Required tests are to be made at the expense of the owner, or his agent, by an approved testing laboratory or other approved agency. (Ord. of 3-12-1998(2), § 1; Ord. of 7-21-2016(3) ) Cross reference— § 10-1005, Remediation or redevelopment to remove designation of blighted condition.
Ask a question about Savannah law
Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.