§ 8-12005 — General provisions
Code of Ordinances of the City of Savannah, Georgia (Division II) (enCodePlus online edition as published 2026-11-20) · Savannah Code of Ordinances, pt. 8, ch. 12., § 8-12005
Corpus is an independent public-information project, not the official City of Savannah website. Stable reference: corpuslaw.us/code/427cff3b-e270-4914-a55e-6e78ff051dd4
Sec. 8-12005. - General provisions.
(1) Chapter administration . The city manager or designee shall administer the provisions of this chapter. (2) General protection of trees on city rights-of-way. (a) Unless otherwise permitted by an applicable city permit or license, no person shall trim, prune, or remove any tree on public property without procuring the written approval of the administrator. (b) No person shall plant any tree or shrub on the right-of-way without written approval, or without meeting the requirements for such planting published by the administrator. (c) No person shall cause damage to trees on rights-of-way or other public property. Damage is defined as cutting, carving, attaching any rope, wires, nails, signs, or other object to any such tree; or allowing any harmful gas, liquid, or solid substance to contact any tree; or to set fire or permit any fire to burn which may injure any portion of any tree; or causing unnecessary harm to tree roots through construction activities, vehicle parking, or material storage. (d) Any removal or damage to trees on rights-of way is subject to compensation to the city as provided in section 8-12007 or section 8-12012. (3) Permit required for tree removal. Except as provided in this chapter, a property owner shall not clear (as defined in section 8-12004) or permit the clearing of property or the removal of any tree without first obtaining a clearing permit as provided for in section 8-12006. (4) Protected trees. The following trees are protected within the City of Savannah and shall not be removed unless a permit has been approved or the requirement waived. (a) On undeveloped property, any tree greater than two inches diameter at breast height (dbh). (b) On developed property, any tree equal to or greater than 12 inches diameter at breast height (dbh), except for single-family residential lots. (c) Any tree retained for the purpose of tree quality points or greenspace requirements. (d) Any tree planted for the purpose of tree quality points. (e) Any tree in a wetland. (f) Any tree designated as a "specimen tree" or an "exceptional tree." (5) Exemptions . The following are exempted from compliance with the permitting requirements of this chapter: (a) Utility easements for power lines, pipelines, or similar facilities, except where such utilities cross tree easements, set-asides or natural buffers. (b) Those portions of airports and heliports which require clear areas for safety purposes, including runways and taxiways, approach and departure clear zones. (c) Land currently zoned and used for agricultural purposes for the duration of such use, provided that property rezoned for purposes other than agriculture shall be subject to the requirements in section 8-12007. (d) Residential lots with an existing single family or duplex until such time it is converted to a non-residential or multi-family use. (e) Any tree determined by an ISA Certified Arborist to be hazardous or an imminent threat to public safety. A tree assessment must be submitted in writing to the administrator for approval prior to removal. (6) Tree/landscape quality points required. (a) A total of not less than 1,600 tree quality points per acre is required for any parcel of land developed and may include existing trees retained and new trees planted. (b) A total of 400 landscape quality points per acre is required for commercial, industrial, institutional and multifamily developments. (c) A total of 1,200 tree quality points per acre is required to be located within any parking area included in a commercial, industrial or multifamily development. The trees planted to meet these tree quality points may also be used toward meeting the overall 1,600 tree quality points per acre. (d) Any site that is proposing a building addition or other improvements over existing developed, non-vegetated, impervious area, requiring submittal of a site plan, shall comply with the tree and landscape quality point requirements for only the portion of the site affected by the addition or improvement. (7) Landscape and Tree Protection Ordinance Manual. The city Landscape and Tree Protection Ordinance Manual is hereby adopted by reference. All land clearing, tree protection, tree establishment and landscaping shall be done in a manner consistent with the provisions contained in said manual. (8) Establishment of a tree fund. There is hereby created a city tree escrow fund for the purpose of receiving money paid to the city in lieu of required tree and landscape quality points, or for compensation for damage or removal of city-owned trees. The fund will be used by the city to purchase, plant, and maintain trees or landscaping on public rights-of-way, easements, or other public property. (9) Designation of a specimen tree. A tree located on commercial, industrial, institutional or multifamily property may be designated as a "specimen tree" if it is found by the administrator to meet the following criteria: preferred large canopy tree species, as outlined in the Landscape and Tree Protection Ordinance Manual; over 24 inches in diameter at breast height (dbh); normal proportion, characteristics and attributes for its size and species; free of disease, pest or injury; and has a life expectancy of at least ten years. Any tree designated as a "specimen tree" shall be deemed desirous of preservation by the City of Savannah and given a quality points factor of two (2.0) when calculating its preserved tree quality points. If a specimen tree cannot be properly preserved and must be removed then an additional amount of large preferred trees at the rate of one tree per inch diameter over 24 will be required of the developer. These additional trees shall be planted on site as space allows and are to be in addition to the trees necessary to meet the required tree quality points. Any remaining trees which cannot be located on site may either be planted off site or met through a payment to the tree fund, as approved by the administrator. (10) Designation of an exceptional tree. Any hardwood canopy tree over 36 inches in diameter, softwood tree species over 30 inches in diameter or understory tree species over eight-inch diameter at breast height (dbh) located on commercial, industrial, institutional or multifamily property may be designated as an "exceptional tree" and will thereafter be considered a public landmark and shall not be destroyed or endangered. (a) Procedure. A tree may be nominated by written request to the park and tree director, or may be nominated by the director. The nomination will be reviewed by the park and tree commission, in conjunction with a representative of the neighborhood association the tree lies within, and confirmed or denied by the city manager. (b) Criteria. The designation of an exceptional tree shall be based upon an evaluation of the tree in relation to one or more of the following criteria: (i) The tree is demonstrated to have an association with a documented historical event, or is located on an historic site. (ii) The tree has unusually high aesthetic value. (iii) The tree is of unique character because of its age, species, variety, location, or because of the size and development of its crown, trunk, or main stem. (iv) The designation of an exceptional tree shall also meet all of the following criteria: (a) The tree is free of disease, pests and other serious injury. (b) The tree has a life expectancy of more than ten years. (c) The tree is free from structural defects which would present a hazard to the public. (c) After designation. Any tree designated as an "exceptional tree" shall be protected from removal or encroachment on the critical root zone, and may be credited toward tree quality points required by this chapter based on quality points factor of three (3.0). If any exceptional tree no longer meets the above-criteria then a property owner may request a permit for removal from the administrator. Replacement for the loss of this tree will be based on one of the following: an approved contingency plan; additional planting of large preferred trees on site; contribution to the tree fund; or through other means of remediation approved by the administrator. ( Ord. of 4-16-2015(3) )
Ask a question about Savannah law
Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.
