Sec. 8-12006. - Permit application requirements.

(1) Application for land disturbance activities permits. (a) Submission requirements. (i) Application. Applications for permits for land disturbance activities shall be submitted by the landowner or an authorized agent on a form provided for this purpose. Such application shall be submitted to the development services department along with all required attachments. Each land disturbance activities permit application shall include the data items, plans, and other pertinent documents. Complete applications shall be transmitted to the administrator for review. The administrator shall certify approved applications to the director of development services for the issuance of permits. (ii) Project description and plans. Such description shall include: (a) Purpose of the requested permit; (b) Plan showing: existing and proposed land uses, buildings, parking, utilities, and light poles; specimen trees, exceptional trees, and existing trees over six-inch diameter at breast height (dbh) to be preserved; landscaping to be used toward the required tree and landscape quality points, and other pertinent elements of development. Required plans are specified in sections 8-12008 and 8-12009. (c) A boundary survey which shall include the location of all easements, building setback lines, nearby zoning district boundaries; (d) A location map at a scale of one-inch equals 1,500 feet or larger, showing the location of the property within the city. (b) If a permit is denied, the reason for denial shall be furnished to the applicant in writing, either electronically or by mail. (c) The administrator may waive the requirement for one or more of the plans listed in subsection (a), upon finding that three or fewer trees are being proposed for removal, no grading is to occur, and such removal will not be contrary to the purpose of these regulations. (2) Procedures for land disturbance permit for non-residential and multi-family developments. (a) A predevelopment site visit shall be scheduled between the owner/agent and the administrator. This meeting may be waived by the administrator at the request of the owner. (b) The owner or developer shall submit the tree protection, tree establishment and the landscape plans, together with other required drawings, to the development services department for review by the administrator. (c) All landscape and tree planting plans for sites over one acre shall be prepared by a registered landscape architect. Plans for sites of less than one acre may be prepared by other registered professionals with competency in landscape design. (d) A preconstruction meeting shall be scheduled among the owner, agent, contractors, appropriate city staff and the administrator prior to issuance of land disturbance permits. This meeting shall establish the location of temporary buildings or trailers, temporary utilities, installation of tree protection and erosion control devices, storage of materials, etc. Forty-eight hours' notice shall be given to schedule the site visit. (e) Tree protection shall be installed by the owner/agent and inspected by the administrator immediately after the issuance of a land disturbance permit. (3) Procedures for land disturbance permit for street right-of-way, utility and drainage easements in new single-family residential subdivision development. (a) A land disturbance permit is required as a prerequisite for clearing rights-of-way and drainage and utility easements in a new residential subdivision. (b) A predevelopment site visit shall be scheduled between the owner/agent and the administrator. This meeting may be waived by the administrator at the request of the owner. (c) After approval of the sketch plan, the centerlines and rights-of-way of the proposed roadways shall be staked at 100-foot stations to enable field review by the administrator. (d) The developer shall show how required tree quality points are to be met in the subdivision or phase of subdivision for which the land clearing permit is sought. This may be shown on a separate greenspace plan or on one of the other construction drawings and shall be submitted to the administrator for review. The greenspace plan shall show the total tree quality points for the site, any set-aside areas and trees to be protected and the number of required canopy trees to be provided. (e) Tree protection for set-asides and/or for any existing tree proposed for tree quality points within the rights-of-way or easements where clearing is to occur shall be installed by the developer and inspected by the administrator prior to issuance of a land disturbance permit. (4) Procedures for obtaining land disturbance permit for lots. A land disturbance permit is required as a prerequisite for acquiring a building permit on a lot in a new residential subdivision. (a) A plot plan shall be submitted to the development services department by the building permit applicant. The plot plan shall show lot dimensions, buildings, driveways, easements, utility corridors and the location of trees to be protected and/or planted. The plot plan shall also include the species and diameter at breast height (dbh) for preserved trees, and caliper for planted trees, and a tree quality point summary for all preserved and/or planted trees. The plot plan shall also show where tree protection devices are to be located with respect to trees to be preserved. (b) The permit center shall forward a copy of the plot plan to the administrator for review and approval. (c) A building permit applicant who owns more than one lot in the same phase of a new subdivision may aggregate or average tree quality points as long as the total tree quality points for all of the lots equals or exceeds the minimum required tree quality points for the combined lots. Where the amount of required tree quality points varies from the approved greenspace plan, the building permit applicant shall show how the required points shall be met on the plot plans. (d) Tree protection devices around trees to be preserved, as shown on the plot plan, shall be installed by the building permit applicant and inspected by the administrator immediately after the issuance of a land disturbance permit. (5) Procedures for approval of underbrushing. The administrator may approve underbrushing and removal of trees or other vegetation up to four inches in diameter upon finding that: (a) Sufficient tree cover exists such that the removal of such trees will limit or prevent compliance with other requirements of this chapter. (b) The removal of such trees is not in conflict with the purpose and intent of these regulations. (6) Timber harvesting requirements for property not zoned for agricultural purposes. (a) Applicability. All properties, other than those zoned and used for agricultural activities, which propose timber harvesting or clear cutting shall comply with the following provisions. (b) Procedures. (i) Permits required for timber harvest. A land disturbance permit is required prior to the timber harvest. (ii) Plans required for timber harvest. A plan for development of the land and a harvest plan shall be submitted to the development services department for review and approval prior to the issuance of a land disturbance permit. (iii) Timber harvest and reforestation plan. The timber harvest and reforestation plan shall identify areas where trees are to be retained or planted on site, along with the density, species and tree quality point value. All required buffers shall be retained or installed as per the buffer requirements in the city zoning regulations and/or any additional buffers required by the metropolitan planning commission. The reforestation plan shall be prepared by a registered forester and shall be reviewed by the administrator. (iv) Reforestation and tree protection standards. A minimum of 1,600 tree quality points per acre shall exist on the parcel after the timber harvest, utilizing one or more of the following methods: (a) Residual stands of trees. Tree quality points may be given to residual stands of trees which are existing on the site and are protected during the harvesting process. (b) Buffer areas. Tree quality points may be given to trees located within buffer areas. (c) Reforestation areas. Where the site is to be used for continual timber growth or silviculture, such land shall be considered a reforestation area. In order to comply with the provisions of this section, a tree establishment plan shall be submitted. This shall consist of the establishment of native tree seedlings using traditional forestry methods and best management practices. A minimum of 600 seedlings per acre shall be planted on the site by the end of the first planting season following the timber harvest. A minimum survival rate of 350 trees per acre will be maintained after the first complete growing season. (d) Tree establishment plan. If an insufficient number of tree quality points are left on the site following the timber harvest, a tree establishment plan shall be submitted to the administrator showing the location of the trees to be planted, their species, size and tree quality point listing. ( Ord. of 4-16-2015(3) )

Ask a question about Savannah law

Corpus searches the Savannah sections it holds and shows the ones that match, with their citations. Free, no sign-in.