§ 22-25 — Application requirements
Code of Ordinances of the City of Cedar Falls, Iowa (Codified through Ordinance No. 3140, enacted March 16, 2026. (Supp. No. 27)) · Cedar Falls Code of Ordinances § 22-25
Corpus is an independent public-information project, not the official City of Cedar Falls website. Stable reference: corpuslaw.us/code/e0246da1-7295-4d6c-8eee-909f7aacf277
Sec. 22-25. - Application requirements.
(a) General application content requirements. The following items shall be included in an application for permit under this article. In addition to the following, the city may, at any point prior to issuing a permit, require the applicant to provide such additional information as the city reasonably deems necessary for effective evaluation of the applicant's permit application. (1) The name, address, phone number and e-mail address of the person preparing the application; (2) If different from the applicant, the legal name, address, phone number and e-mail address of a wireless provider seeking to install, own and operate the wireless facilities; (3) The name, address, and phone number of the title holder of the support structure, pole or tower of the wireless facility; (4) A general description of the proposed work and the purposes and intent of the wireless facility. The scope and detail of such description shall be appropriate to the nature and character of the work to be performed, with special emphasis on those matters likely to be affected or impacted by the work proposed; (5) A street map identifying the specific location, including the postal address of the immediately adjacent property, GPS coordinates (latitude and longitude) in decimal degrees for the proposed small wireless facility location; (6) Street view photographic images of the location; (7) If requested by the city, to-scale photographic simulations of the wireless facility "before and after construction" from key viewpoints inside of the city, and a map showing the locations of where the photos were taken and the distance(s) of each photo location from the proposed structure. If required, guidance will be provided concerning the appropriate key viewpoints on an individual application basis; (8) The location of the nearest residential structure; (9) The location, size and height of all existing and proposed support structures and poles above 40 feet in height, whether or not currently supporting a wireless facility, within 500 feet of the proposed location; (10) The transmission and maximum effective radiated power of the antenna(s), as well as a list of the specific frequency bands to be initially activated upon completion of construction and a copy of the FCC licenses applicable for all the frequency bands licensed to the carrier or to the wireless provider; (11) A written statement affirming that (a) the applicant's wireless facility shall always without exception be maintained in a safe manner, and in compliance with all conditions of the permit, all applicable and permissible local codes and regulations and all applicable city, state and federal laws, rules, and regulations; (12) An explanation regarding the reason for choosing the proposed location and, if applicable, the reason the applicant did not choose collocation. If applicable, the explanation shall include a sworn statement from an individual who has responsibility over placement of the tower attesting that collocation within the area determined by the applicant to meet the applicant's radio frequency engineering requirements for the placement of a site would not result in the same service functionality, coverage, and capacity, is technically infeasible, or is economically burdensome to the applicant; (13) Certified detailed construction drawings, including, but not limited to, the following information: a. A survey showing the location of all adjacent lot lines and rights-of-way; b. All existing and proposed ground-mounted enclosures and cabinets within 50 feet of the proposed wireless facility site; c. Elevation drawings showing the profile or the vertical rendition of the facility, and specifically identifying all existing and proposed attachments and all related fixtures, structures, appurtenances and apparatus, including the height above the existing grade, materials, colors and lighting; d. Proposed connection to wireline or wireless backhaul; and e. Proposed electrical service and grounding plans for the facility. (14) The type and manufacturer of the existing or proposed support structure and a rigorous structural analysis and report, including calculations and loading analysis, certified by a licensed Iowa Professional Engineer, proving the structure's capability to safely accommodate the proposed facilities. No permit will be issued for any wireless facility where the support structure is in need of safety-related remediation to comply with the requirements of this article and other adopted standards of the city or CFU, unless and until all remediation work that is deemed necessary has been completed or a schedule for the remediation work has been approved by the city. (15) For placement of antennas with the lowest part of the antenna less than 33 feet in height, a completed and signed checklist for categorical exclusion of radio frequency electromagnetic emissions. If the modification, collocation or placement of a wireless facility is not categorically excluded based on applicable FCC rules, the applicant shall provide an RF compliance letter to the city and shall remain in full compliance with all related requirements set forth by FCC. The city may require the permit holder to perform an on-site RF survey of the facility after the construction or modification of the facility. Such survey shall be done under the observation and direction of the city or its designee, and an un-redacted copy of the survey results along with all calculations provided to the city. (16) A security plan, including emergency contact information, location and accessibility of a main breaker switch, emergency procedures to follow, and a description of an anticipated maintenance program. (17) Written documentation evidencing approval of the owner of any tower, pole, support structure, or other structure which a wireless facility or any associated equipment is proposed to be attached. (18) The applicant may designate as such portions of its application materials that it reasonably believes contain proprietary or confidential information to the extent consistent with applicable law and open records requirements. (b) Application involving substantial modification. An application for permit to substantially modify an existing wireless facility or support structure shall include the following: (1) Information clearly identifying the wireless provider and the subject wireless facility or support structure. (2) A to-scale visual depiction of the modification. (3) A narrative explaining the nature of the proposed modification. (4) A certified structural report, including calculations, demonstrating the structure's capacity to accommodate the wireless facility following the proposed modification. (5) If requested by the city, to-scale photographic simulations of the wireless facility "before and after construction" from key viewpoints inside of the city as may be appropriate and required and a map showing the locations of where the photos were taken and the distance(s) of each photo location from the proposed structure. If required, guidance will be provided concerning the appropriate key viewpoints on an individual application basis. (6) A narrative description of activities proposed to minimize the visual impact of such modification. (c) Pre-application meeting. All prospective applicants are requested to initiate an informal pre-application meeting with the planning and community services division, which may be held either in-person or telephonically as deemed appropriate. The purpose of the pre-application meeting will be to expedite the application review and permitting process by identifying and preliminarily addressing any significant issues or concerns the city or the applicant may have. Participation in a pre-application meeting shall not commence the applicable review period.
(Ord. No. 2975, § 2, 11-16-2020)
Ask a question about Cedar Falls law
Corpus searches the Cedar Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.
