For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-32 — Attachment to CFU or city-owned support structures

Code of Ordinances of the City of Cedar Falls, Iowa (Codified through Ordinance No. 3140, enacted March 16, 2026. (Supp. No. 27)) · Cedar Falls Code of Ordinances § 22-32

Corpus is an independent public-information project, not the official City of Cedar Falls website. Stable reference: corpuslaw.us/code/6b61f14f-5820-4f31-ae45-592718c2958b

Sec. 22-32. - Attachment to CFU or city-owned support structures.

(a) Attachment agreement required. A wireless provider shall not attach wireless facilities to a CFU utility pole or street light pole, or any city-owned support structure without first obtaining an attachment agreement with CFU or the city, as applicable. (b) Annual rate. Wireless providers shall pay the annual attachment fee specified in the city's fee schedule for each city-owned support structure in the public rights-of-way upon which the wireless provider has installed a wireless facility. The annual attachment rates for the use of CFU utility poles and street light poles shall be set out in the applicable pole attachment agreement. (c) Power source. The power source and associated metering must be determined and approved by Cedar Falls Utilities. (d) Installations on traffic signal poles and street light poles. Proposed installations on all traffic signal poles or street light poles must not interfere with the integrity of the facility in any way that may compromise the safety of the public. The installation must not interfere with other existing uses (seasonal or permanent) on the pole such as traffic signals, street lights, hanging flower planters, flags, and/or banners or similar enhancements. Installation of small wireless facilities on any traffic signal pole or street light pole shall: (1) Be encased in a separate conduit than the traffic light electronics; (2) Have a separate electric power connection than the traffic signal/street light structure; and (3) Have a separate access point than the traffic signal/street light structure. (e) Reservation of space. An application for space on a CFU or city-owned wireless support structure that conflicts with space reserved for future public safety, utility, communication or transportation uses will be denied unless the provider pays for the replacement of the pole or wireless support structure and the replaced pole or wireless support structure will accommodate the future use and the small wireless facility. (f) Make-ready. For city-owned support structures, the city shall provide a good faith estimate of any make-ready work necessary to enable the pole or structure to support the requested wireless facility, including replacement of the structure if necessary, within 45 days after receipt of a completed request. Make-ready work for attachments including any structure replacement shall be completed within 30 days of the wireless provider's written acceptance of the city's good faith estimate at the costs to be paid by the provider.

(Ord. No. 2975, § 2, 11-16-2020)

Ask a question about Cedar Falls law

Corpus searches the Cedar Falls sections it holds and shows the ones that match, with their citations. Free, no sign-in.