Sec. 26-30. - Floodplain development permit.

(a) A floodplain development permit issued by the zoning administrator shall be secured prior to initiation of any floodplain development. Application for a floodplain development permit shall be made on forms supplied by the zoning administrator and shall include the following information: (1) A description of the work to be covered by the permit for which application is to be made. (2) A description of the land on which the proposed work is to be done, i.e., lot, block, tract, street address or similar description that will readily identify and locate the work to be done. (3) Location and dimensions of all structures and additions (4) An indication of the use or occupancy for which the proposed work is intended. (5) The elevations of the 100-year (one percent) and 500-year (0.2 percent) flood. (6) The elevation, in relation to the North American Vertical Datum of 1988 (NAVD), of the lowest floor, including basement, of structures or of the level to which a structure is to be floodproofed. (7) For structures being improved or rebuilt, the estimated cost of improvements and fair market value of the structure prior to the improvements. (8) Such other information as the administrator deems reasonably necessary for the purpose of this chapter. (b) Floodplain development permits issued on the basis of approved plans and applications authorize only the use, arrangement and construction set forth in such approved plans and applications and no other use, arrangement or construction. Any use, arrangement, or construction at variance with that authorized shall be deemed a violation of this chapter and shall be punishable as provided in this chapter. The applicant shall be required to submit certification by a professional engineer or land surveyor, as appropriate, registered in the state, that the finished fill, building floor elevations, floodproofing or other flood protection measures were accomplished in compliance with the provisions of this chapter prior to the use or occupancy of any structure. (c) All development or structures in the floodway, floodway fringe and general floodplain districts requiring special exception permits shall be allowed only upon application to the zoning administrator with issuance of the special exception permit by the board of adjustment. Petitioners shall include information ordinarily submitted with applications, as well as any additional information deemed necessary by the board of adjustment. Where required, approval of the state department of natural resources shall precede issuance of the special exception permit by the board of adjustment. (d) The zoning administrator shall, within a reasonable time, make a determination as to whether the proposed floodplain development meets the applicable provisions and standards of this chapter, and shall approve or disapprove the application. In case of disapproval, the applicant shall be informed, in writing, of a specific reason therefor. The zoning administrator shall not issue permits for special exception permits or variances except as directed by the board of adjustment.

(Ord. No. 2922, § 1(29-34), 5-7-2018; Ord. No. 3051, § 2, 4-15-2024)