Sec. 26-31. - Variances and special exception permits.

(a) The board of adjustment may authorize, upon request, in specific cases, such variances from the terms of this chapter as will not be contrary to the public interest, where owing to special conditions a literal enforcement of the provisions of this chapter will result in unnecessary hardship. Variances granted must meet the following applicable standards: (1) No variance shall be granted for any development within the floodway district which would result in any increase in floods during the occurrence of the 500-year flood. Consideration of the effects of any development on flood levels shall be based upon the assumption that an equal degree of development would be allowed for similarly situated lands. (2) Variances shall only be granted upon: a. A showing of good and sufficient cause; b. A determination that failure to grant the variance would result in exceptional hardship to the applicant; and c. A determination that the granting of the variance will not result in increased flood heights, additional threats to public safety or extraordinary public expense, create nuisances, or cause fraud on or victimization of the public. (3) Variances shall only be granted upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. (4) In cases where the variance involves a lower level of flood protection for structures than what is ordinarily required by this chapter, the applicant shall be notified in writing over the signature of the zoning administrator that: a. The issuance of a variance will result in increased premium rates for flood insurance up to amounts as high as $25.00 for $100.00 of insurance coverage; and b. Such construction increases risk to life and property. (5) All variances granted shall have the concurrence or approval of the state department of natural resources. (b) In passing upon applications for special exception permits or requests for variances, the board shall consider all relevant factors specified in other sections of this chapter and: (1) The danger to life and property due to increased flood heights or velocities caused by encroachments. (2) The danger that materials may be swept onto other lands or downstream to the injury of others. (3) The proposed water supply and sanitation systems and the ability of these systems to prevent disease, contamination, and unsanitary conditions. (4) The susceptibility of the proposed facility and its contents to flood damage and the effect of such damage on the individual owner. (5) The importance of the services provided by the proposed facility to the community. (6) The requirements of the facility for a floodplain location. (7) The availability of alternative locations not subject to flooding for the proposed use. (8) The compatibility of the proposed use with existing development and development anticipated in the foreseeable future. (9) The relationship of the proposed use to the comprehensive plan and floodplain management program for the area. (10) The safety of access to the property in times of flood for ordinary and emergency vehicles. (11) The expected heights, velocity, duration, rate of rise and sediment transport of the floodwater expected at the site. (12) Such other factors which are relevant to the purpose of this chapter. (c) Upon consideration of the factors listed in subsection (b) of this section, the board may attach such conditions to the granting of special exception permits or variances as it deems necessary to further the purpose of this chapter. Such conditions may include, but not necessarily be limited to: (1) Modification of waste disposal and water supply facilities. (2) Limitation on periods of use and operation. (3) Imposition of operational controls, sureties, and deed restrictions. (4) Requirements for construction of channel modifications, dikes, levees, and other protective measures, provided such are approved by the state department of natural resources and are deemed the only practical alternative for achieving the purposes of this chapter. (5) Floodproofing measures shall be designed consistent with the flood protection elevation for the particular area, flood velocities, durations, rate of rise, hydrostatic and hydrodynamic forces, and other factors associated with the regulatory flood. The board of adjustment shall require that the applicant submit a plan or document certified by a registered professional engineer that the floodproofing measures are consistent with the regulatory flood protection elevation and associated flood factors for the particular area. Such floodproofing measures may include, but are not necessarily limited to, the following: a. Anchorage to resist flotation and lateral movement. b. Installation of watertight doors, bulkheads and shutters, or similar methods of construction. c. Reinforcement of walls to resist water pressures. d. Use of paints, membranes, or mortars to reduce seepage of water through walls. e. Addition of mass or weight structures to resist flotation. f. Installation of pumps to lower water levels in structures. g. Construction of water supply and waste treatment systems so as to prevent the entrance of floodwaters. (6) Pumping facilities or comparable practices for subsurface drainage systems for structures to relieve external foundation wall and basement flood pressures. (7) Construction to resist rupture or collapse caused by water pressure or floating debris. (8) Installation of valves or controls on sanitary and storm drains which will permit the drains to be closed to prevent backup of sewage and stormwaters into the buildings or structures. (9) Location of all electrical equipment, circuits and installed electrical appliances in a manner which will ensure that they are not subject to flooding.

(Ord. No. 2922, § 1(29-35), 5-7-2018; Ord. No. 3051, § 3, 4-15-2024)