§ 12.04 — Water Service Connections
Cedar Rapids, Iowa, Municipal Code (Supp. No. 25, Update 1: codified through Ordinance No. 025-26, passed July 28, 2026) · Cedar Rapids Municipal Code § 12.04
Corpus is an independent public-information project, not the official City of Cedar Rapids website. Stable reference: corpuslaw.us/code/61cfd864-8495-4973-9583-f3e3d7b358f5
12.04 - Water Service Connections.
Applications. Applications for water service connection(s) shall be made with the Water Division by the owner or agent of the property to be served. Such application shall state the street address of the premises to be served, the size of pipe required and the approximate location where such service will enter the premises. If an application is approved, all taps or connections to the water mains will then be made by the Water Division and provided to the plumber or pipe layer engaged by the applicant. The costs for taps and meters will be charged for at the rates established in Section 12.28 for tapping, meter and service charges. No taps or connections to the water mains shall be made by anyone except the authorized employees or a contractor of the Water Division. Water connection fee. The Water Connection Fee is intended to recoup a portion of the value of the existing rate payers' investment in the water supply source that makes possible the availability of water to a property. This investment is represented by the existing water supply infrastructure of well fields, water treatment plants, storage facilities, distribution system, and transmission system. The Water Connection Fee described below does not include tapping costs, meter charges, or service charges described elsewhere in this Chapter. The fee described below does not include the cost of water main extended by the City to serve properties not currently served. For those properties where adjacent water mains have previously been constructed at no expense to the property owners, the following Connection Fee shall apply: The water connection fee for a single-family or two-family residence, regardless of area of the lot or tract upon which the dwelling is located shall be one thousand dollars ($1000). The charge for all other uses shall be the product of one thousand dollars ($1000) per acre of land to be served by the water system connection, provided the minimum charge shall be one thousand dollars ($1000). The area of the property used in the calculation shall be the area of the property outside the public right-of-way. Payment shall be made prior to the start of construction. Payment of this fee shall be made to the City at the time service is requested. The connection shall not be made until the payment has been made to the City. Costs in addition to the connection fee may be owed to the City for water main extended past a property but not currently connected to the water system. See Section 12.04 (d) below for discussion of other costs that may be owed for water main extended by the City in areas not previously served, and that will apply to properties in areas from which costs for water main extensions are to be recovered by the City. In areas of the City where a private developer is connecting to an existing public water main and extending public water main to serve property through the Subdivision Ordinance process, no connection fee will be charged to the developer except as provided in paragraph 12.04(d) below. Private developer installed water main. Developers shall pay the total cost of engineering and construction of water mains from the existing main to their point of connection and sufficiently beyond to allow for future extensions without disruption of service. This shall include all costs of acquiring easements. Construction Observation costs may also be included in accordance with Chapter 31. Plans for water main extensions must be approved by authorized representatives of the City. Water mains must be sized to meet requirements for domestic plus fire flow water demands and in accordance with the SUDAS Specifications and Cedar Rapids Supplement to SUDAS. The City may require the design and construction of water mains with the ability to service lands other than the immediately adjoining land and may require installation of water mains sized larger than the minimum required to provide domestic and fire flow needs for the development. In this circumstance, the City shall reimburse the developer for the incremental difference in material cost above that of the cost for water main materials needed to provide domestic and fire flow needs. The City will not reimburse the developer for water mains above 8-inch if larger diameter water main is needed to provide domestic and fire flow water demands in the development. Only mains sized larger than an 8-inch main may be considered eligible for reimbursement purposes. The reimbursement will be based on the difference in pipe costs only, and no allowance will be made for the difference in installation costs. The most current Water Division purchase price list will be used in the determination of the incremental cost payment. The need for the upsizing, the size of pipe to be installed, and the cost the City will reimburse shall be documented in the Development Agreement between the City and the developer. The minimum pipe size required shall be 8-inch water main, with larger main diameter being considered the minimum if needed to provide domestic and fire flow requirements. 6-inch main may be used for short dead-end mains serving fire hydrants if adequate fire flows are provided, and with the approval of the Water Division. In areas where water main may be extended by a developer past properties owned by others outside of the final plat to serve the area of the final plat, such extension shall be at no expense to the City. The City shall not be obligated to collect any portion of this cost for reimbursement to the developer. Existing agreements to reimburse related to projects that pre-date the enactment of this ordinance update will be honored until their expiration date. Water main extended by the city to areas not previously served. Water main may be extended by the City to serve areas not previously served if the water main extension is consistent with City Council policy, and if agreed to by the City. Costs to be recovered by the City may be recorded in an Extension of Service Area Agreement or other Agreement. A Water and Sewer Extension Area defining the properties served may be established by ordinance. Any previous written arrangements or contracts for water main extensions that pre-date this ordinance update shall remain in effect until expired. Repair and installations of private facilities. The City may make repairs and installations at any time deemed necessary by appropriate officials of the Water Division and charge the owner of the property served for their work at prices and terms to be established from time to time by the Council. When no prices have been established, charges shall be made at the actual cost of labor, material, and administrative costs. Installment payments. Owners with an existing single-family residence on the property to be served may elect to pay water main connection charges, service line repair charges, or service line installation charges due to the Utilities Department in monthly installments over a period of 5 years (60 months). The monthly installment shall include interest at the rate of 7 percent per annum on the unpaid balance. The right of the account holder to receive water service is for only as long as the installments are kept current. Installments are due 21 days after the date of the bill and are considered delinquent if not paid on or before the due date. Failure to pay delinquent installment(s) may result in the water service termination (shutoff) for the property. A notice of delinquency will be mailed no less than 7 days prior to the termination (shutoff). When termination occurs, service will not be turned on again until installments and all other charges due for services to the account holder, including delinquency penalties and charges for turning water on/off, have been paid. In addition, the City may impose a lien upon the property served for any and all delinquent and other municipal utility charges in accordance with Section 384.84 of the Iowa Code. Construction observation. The construction of improvements may be observed by Water Division Staff to verify compliance with the approved plans, technical specifications, and details. Testing shall be performed by the Water Division to ensure the integrity and safety of the improvements connected to the Public Water Distribution System. When not covered under Chapter 31, the cost of such observation and testing shall be charged as fees per Section 12.28(e) approved by City Council resolution. The applicant shall be invoiced for these costs and all invoiced observation and testing costs shall be paid to the City prior to activation of water service. Service pipe permits. No work on the private portion of the service pipe shall be undertaken unless appropriate permits (plumbing and Right of Way) have been issued by the City of Cedar Rapids. Right of access. The City reserves the right to access private facilities for the purpose of water quality sampling and testing whenever it is deemed advisable to do so. Failure to allow access may result in shutoff of water service serving such premises. (025-24)
Ask a question about Cedar Rapids law
Corpus searches the Cedar Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.