For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-4-11 — Building sewers and service connections

Code of Ordinances of the City of Meridian, Idaho (Supp. No. 14: codified through Ordinance No. 26-2129, enacted July 7, 2026) · Meridian Code of Ordinances § 9-4-11

Corpus is an independent public-information project, not the official City of Meridian website. Stable reference: corpuslaw.us/code/ce670e90-b6cd-45b5-ba66-3516f9a06d2c

9-4-11. - Building sewers and service connections.

All materials and workmanship in the installation of building sewers and service connections shall conform to the following regulations: A. Permit required. No unauthorized person shall uncover, make any connections with or opening into, use, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the city. The permit shall not be issued until all sewer assessment charges and other applicable fees have been paid in full. B. Classes of permits. There shall be two (2) classes of building sewer permits: A general permit for residential and commercial sewer service, and industrial user permits for sewer service to establishments producing industrial wastes. 1. General permits. The owner or his agent shall make application to the public works department for general permits. The permit application shall be supplemented by any plans, specifications or other information considered pertinent in the judgment of the city at the time the application is filed. Also, the owner or his agent shall pay to the city, at the time the permit is issued, an assessment fee, which shall be established by resolution of the City Council; and 2. Industrial permits. Industrial user permits shall be applied for by the owner or his agent by letter to the City Council accompanied by an executed copy of the industrial user agreement together with any plans, specifications or other information considered pertinent in the judgment of the city. Industrial user permits shall be approved by the City Council based on recommendation by the Public Works Director. Approval shall be contingent upon the availability of excess capacity in the sewage treatment plant, the provisions of this chapter and any other considerations the City Council deems appropriate. The amount of the permit, inspection fee and assessment fee for an industrial wastes sewer service will vary with each permit and shall be established by the city at the time of application. The owner shall pay all fees at the time the permit is issued. C. Costs borne by owner; liability. All costs and expense incident to the installation and connection of the building sewer and service connection shall be borne by the owner. The owner shall indemnify and hold harmless the city from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer and the marking of the service connection for same to the public sewer. D. Separate connections for each building. A separate and independent building sewer and service connection shall be provided for every building. Any exception to this requirement shall conform with uniform plumbing code. E. Old building sewers. Old building sewers may be used in connection with new buildings only when they are found, on examination and being tested as required by the city, to meet all requirements of this chapter. F. Conformance with building and plumbing codes. The materials of construction of the building sewer and service connections, and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the building and plumbing codes as have been or may be adopted by the city. G. Pipe size; building sewer grade and slope. All building sewers shall meet the requirements of the international building code or uniform plumbing code. H. Connecting surface water drainage to building sewer. No person shall make connection of roof downspouts, exterior foundation drains, areaway drains or other sources of surface runoff or ground water to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. I. Service connection requirements. The service connection to the public sewer shall conform to the requirements of the international building code and uniform plumbing code as adopted by the city. J. Notify city for inspection. The applicant for the building sewer permit shall notify the city when the connection of the building sewer to the public sewer is ready for inspection. K. Guarding excavations. All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city. L. Work done by contractor. The connection of the building sewer service to the public main sewer shall be made by a public works contractor having a valid State of Idaho License for this specialty work.

(Ord. 04-1105, 10-5-2004)

Ask a question about Meridian law

Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.