9-4-32. - Private sewage disposal systems.
Where a public sanitary sewer is not available under the provisions of this chapter, the building sewer shall be connected to a private sewer disposal system complying with the provisions of this chapter and in accordance with the following special provisions. Private home association lift station(s) BMP requirements are included under this section. A. Permit required; permit and inspection fee. Before commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit from the city. The applicant shall provide plans, specifications and other information as may be deemed necessary by the city. Review and inspection fees shall be established by resolution of the City Council. B. Inspection and approval by city. Building permits for any structure to be served by an approved private sewage disposal system shall not be issued until the installation is completed to the satisfaction of the City Engineer. The city shall be allowed to inspect the work at any stage of construction and the owner shall notify the city when the work is ready for final inspection and before any underground works are covered. The applicant shall be responsible for payment of all applicable inspection fees prior to issue of a building permit. C. Compliance with state regulations. The type, capacities, location and layout of a private sewage disposal system shall comply with all of the rules and regulations and recommendations of the Idaho Department of Environmental Quality, Idaho Department of Health and Welfare and/or the Central District Health Department. No septic tank or cesspool shall be permitted to discharge to any natural outlet. D. Connection to public sewer when available. At such time as a public sewer becomes available to property served by a private sewage disposal system, a direct connection shall be made to the public sewer in compliance with this chapter and any septic tank, cesspool or similar private sewage disposal facilities shall be abandoned and filled with suitable material and all appropriate fees paid. E. Operation in sanitary manner. The owners shall operate and maintain the private sewage disposal facility in a sanitary manner at all times and at no expense to the city. F. Septic tank pumpings; disposal and fee. Septic tank pumpings shall not be deposited in any manhole, cleanout or sewer opening. The pumpings may be dumped at the sewage treatment plant at a point designated by the city. The number of gallons dumped and the nature of the wastes shall be provided to the plant operator prior to dumping. A fee for the septic tank dumping shall be determined by the City Council. G. Additional state requirements. No statement contained in this section shall be construed to interfere with any additional requirements that may be imposed by the Department of Environmental Quality or Department of Health and Welfare of the State of Idaho. H. Private lift station best management practices (BMP) requirements. The owner shall operate and maintain the private lift station equipment, and building structure(s), to the City of Meridian requirements as defined by this section. Federal, state and local laws may also apply. 1. Maintenance and repairs. Maintenance and repairs are to be conducted in a timely manner on all pumps, building structures, and electrical equipment; records are to be retained for a minimum of three (3) years. The Superintendent can request records at any time. 2. Operational procedures. Operational procedures are to be submitted in writing to the Superintendent or designee for approval to operate lift station. The lift station is to be operated in accordance with the approved procedures. No changes are permitted without prior approval from the Superintendent or designee. 3. Emergency notification requirements. Significant equipment failures, sewer line backups or any sewer overflows are to be reported immediately to the City of Meridian wastewater treatment plant (POTW) twenty-four-hour telephone number, (208) 888-2191. 4. Insurance. Insurance is to be carried by the lift station owner at the owner's expense. Coverage will cover hazards of fire, lightning, flood, explosion, or unavoidable casualty. 5. Right of entry. The City of Meridian retains the rights of entry to any private lift station site and/or access any associated equipment during any time; for inspection purposes and/or to take the appropriate action to prevent a permit violation; as defined by POTW NPDES permit requirements and/or prevent public health/safety issues.
(Ord. 08-1389, 10-28-2008, eff. 10-28-2008)
Ask a question about Meridian law
Corpus searches the Meridian sections it holds and shows the ones that match, with their citations. Free, no sign-in.