10-1-17. - Relocated residential buildings.
Move-on houses, manufactured houses more than five years of age (based on date of proposed move), garages, may be relocated into or within the City of Nampa under the following conditions: A. Relocated structures shall be brought into substantial compliance with current building, electrical, plumbing, mechanical and energy codes as adopted by the City of Nampa. B. Structures requesting consideration for relocation must be inspected by the building safety department prior to moving. The inspection shall be done in accordance with the provisions of section 4-6-4, "Inspection" of this Code. The inspection report outlining the required reparations to bring the move-on structure into substantial compliance with applicable codes shall be issued and become a condition of the building permit. C. The property owner shall provide a cashier's check (preferable) or a letter of credit (acceptable but less preferred) in and for the amount of the estimated demolition cost for the relocated structure and restoration of the property. The owner/permittee may obtain an independent third party bid from a legitimate demolition contractor for the required demolition and site restoration. In the absence of a qualified bid the building official shall estimate the amount of demolition and restoration, and the owner/permittee shall provide a bond in an amount of one and one-half times the estimate. The bond shall be made payable to the City of Nampa and shall be exercised upon failure of the owner/permittee to complete the work specified by the building permit conditions. D. Upon expiration of a building permit to emplace a move-on structure or, after one year from the date of the building permit's issuance, whichever is sooner, the city will demand that all required reparations be completed as originally conditioned by the building permit. If the owner fails to complete the work as required the building official shall issue a notice and order as specified in city's adopted abatement code (the Uniform Code for the Abatement of Dangerous Buildings, 1997 edition). This notice and order shall specify a time not to exceed 60 days for the owner/permittee to complete the work. Failure to then finish the work shall, upon following proper due process, cause the city to raze the building using the bond to cover costs.
(Ord. No. 4617, § 1(Exh. A), 10-4-2021)
Ask a question about Nampa law
Corpus searches the Nampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.