For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-1-6 — Improvements required upon a change, expansion or enlargement of building(s) and/or principal property use, bonding, financial security or guarantee

Code of Ordinances of the City of Nampa, Idaho (Codified through Ordinance No. 4907, adopted January 5, 2026 (Supp. No. 16, Update 1)) · Nampa Code of Ordinances § 10-1-6

Corpus is an independent public-information project, not the official City of Nampa website. Stable reference: corpuslaw.us/code/6d95fa70-6ac6-4517-a911-a16adc5d5270

10-1-6. - Improvements required upon a change, expansion or enlargement of building(s) and/or principal property use, bonding, financial security or guarantee.

Improvements as defined in subsection C of this section are required to be emplaced on a lot or parcel or in a structure whenever: A use on a lot or parcel, or one or more structures on a parcel or lot is expanded or enlarged in accordance with subsection A of this section (Exception: Design review standards shall not apply to existing facades unless they themselves are to be physically altered.); When there is either a change of occupancy of a structure on a lot or parcel in accordance with subsection B of this section; or Substantial refurbishment of a parking lot occurs, in accordance with subsection A.5 of this section. All changes of use of a structure require the issuance of a building permit and the subsequent certificate of occupancy from the City of Nampa, Building Safety Division. A. Specific scope of requirement(s) relating to structural and/or use expansions or parking lot refurbishments. Site improvements shall be made to a property whenever one of the following situations occurs: 1. Principal use has changed. The principal use of a structure and/or a property is changed to another as stipulated in subsection B of this section; 2. Single structure use expanded/enlarged by 25 percent. The principal use of a single structure and/or portion of a property devoted to a use (i.e., building footprints, enclosed yard areas, parking areas) is expanded or enlarged by 25 percent or more of the existing use's area or building square footage (by devoting more land to a particular use, and/or, adding additional structures to a property devoted to a use). However, unenclosed, noncommercial awnings, patio covers and shade ports additions that will not have the effect of increasing a building's occupancy rating are, and shall be, exempt from this requirement unless they are (to be) larger than 50 percent of an existing building's footprint; 3. Single structure square footage expanded/enlarged by 25 percent. When amongst multiple structures on the same property, a single structure is expanded or enlarged by 25 percent or more of that particular structure's square footage, regardless of the areas of the other structures; 4. Multiple structures' collective square footage expanded by 25 percent. When a group of two or more structures on the same premises is expanded or enlarged either by 25 percent or more of the combined square footage of either of those structures, added collectively, or 25 percent or more of the area of all the structures on the property; or 5. Parking lot expansion/renovation. When a parking lot is expanded or torn up and reconstructed (as opposed to being just resealed and/or striped) only the parking lot area itself (i.e., that part being renovated) shall be improved to meet current code(s). This shall require that landscaping and ADA parking be emplaced in and/or around the parking area such that the parking area complies with chapters 22 and 33 of this title including the 15-foot wide landscape buffer. Also, any engineering, water, wastewater or fire division/department improvement requirements shall apply to the "new" parking area. For example, such things as curb, gutter, sidewalk, curb cuts, drainage features, etc., shall all be improved or emplaced as part of the refurbishment of the parking area as required by the city. A site improvement permit shall be required of an applicant and reviewed by the city (as specified in chapter 22 of this title) to ensure correct execution of this requirement unless the parking lot is being renovated because of concurrent interior structure remodeling occurring, or slated to occur, on the same property. In the case of parking lots simply being restriped (whether a slurry seal is used or not), the parking shall be arranged to comply with section 10-1-15, figure 1, of this chapter, but the parking lot need not be landscaped. a. Required parking spaces. When a building is enlarged in height or in ground coverage, off-street parking shall be provided for the enlargement in accordance with the requirements of this chapter and chapter 22 of this title. 6. Landscape expansion/renovation. A landscape plan review and approval for subdivisions, multi-family developments, commercial developments, industrial developments, industrial park developments, healthcare developments, institutional developments, and institutional campus developments is required, when the following occurs: a. Changes/revisions/upgrades to grass, trees, shrubs and/or irrigation that differ from the originally approved landscape plan by more than 25 percent. b. If no approved landscape plan exists, the proposed landscape (grass, trees, shrubs and/or irrigation) changes differ more than 25 percent from the existing area, B. Change of use. Change of use shall be considered as occurring, or when there is proposed: 1. Any change of occupancy group of a structure(s) according to the city's currently adopted edition of the IBC. Per chapter 3, use and occupancy classification, the principal occupancy groups are: Group A | Assembly Group B | Business Group E | Educational Group F | Factory and industrial Group H | High hazard Group I | Institutional Group M | Mercantile Group R | Residential Group S | Storage Group U | Utility/miscellaneous 2. Any changes of the primary use(s) of a property from being vacant/open to having new development/construction proposed upon it; and/or 3. Any change of the majority of use to multi-tenant structures (e.g., shopping centers). (Such structures shall be treated as single use facilities when dealing with changes.) The aggregate area of a center devoted to retail uses versus, for instance, office use(s) shall be used when determining whether a change of use has occurred. Hence, for example, a large mall with various retail lessees shall not be required to upgrade with needed landscaping unless a majority of the retail users have left, and offices or other noncommercial sales businesses have filled their space(s). C. Emplaced improvements. Improvements required to be emplaced with or upon occurrence of an expansion or change of use as previously explained include: 1. General property landscaping as required by chapter 33 of this title. 2. Street, curb, gutter, stormwater collection and discharge, driveway approach, sidewalk and related improvements as required by the city engineer or his/her designee and/or any currently adopted downtown revitalization or streetscape plan. 3. On site loading, parking lot/space improvements (including parking lot landscaping treatment). Such improvements shall include new paving or resurfacing and/or striping, as needed, to provide clear designated parking, loading and maneuvering space areas, and such shall be arranged in accordance with design regulations imposed by this title. 4. A landscaped buffer area developed in accordance with standards set forth in chapter 33 and the applicable zoning chapter of this title shall be provided on properties along streets identified by the adopted Nampa street/path master plan map, Nampa Comprehensive Plan, and/or the city engineer as arterial or collector thoroughfares. The strip shall be emplaced when a property is newly developed or redeveloped or expanded as described in subsections A.1 through A.5 of this section or the use is changed as described in subsection B of this section. Any land between the landscape strip and the developed roadway within the abutting right-of-way shall also be landscaped but only with grass, crushed rock or gravel, shrubs and/or flowers. 5. Provision of pathway/trailway space by easement, or deed and dedication or by making the space a common lot in a subdivision as required by the planning and zoning department in accordance with the "Nampa Bicycle and Pedestrian Master Plan" and the city's comprehensive plan. This requirement shall apply against those properties that physically adjoin or abut a proposed trailway section as shown on the "Nampa proposed bikeway and off-street pathway network map in the Nampa Bicycle and Pedestrian Master Plan" or its currently adopted parks and recreation plan. 6. Work on any "preexisting" residential structure(s) on a property to change the same into a non-single-family residential structure (e.g., expansion of a house into a duplex) shall be performed such that either said preexisting dwelling structure is first or concurrently made to comply with City of Nampa currently adopted building and zoning codes as part of site/project development, or, is removed from the site. Such work shall of necessity be satisfactorily accomplished before a certificate of occupancy may be issued by the city for the new or newly expanded/converted residential structure. 7. Provision of improvements required by the currently adopted downtown implementation plan. D. Completion of improvements. Unless otherwise provided, all improvements may be made a condition(s) of any building/occupancy permit, and they shall be completed prior to final inspection and permanent occupancy of the building or property. E. Bonding, financial security or guarantee. Certificate of occupancy for a structure or tenant, by the City of Nampa, shall not occur in any multi-family, commercial or industrial structure until such time as all required site improvements have been completed/installed. If extenuating circumstances cause the improvements to be delayed, the applicant may request deferral of these improvements by providing the city with either an approved one-year irrevocable letter of credit issued by their financial institution or a check or cashier's check in the amount of 150 percent of the documented estimate for the completed work. For multi-tenant projects, an approved phasing plan, from the planning director, or his/her designee, is required prior to occupancy of any tenant space.

(Ord. No. 4617, § 1(Exh. A), 10-4-2021; Ord. No. 4702, § 1(Exh. A), 12-5-2022; Ord. No. 4777, § 1(Exh. A), 12-18-2023; Ord. No. 4809, § 1(Exh. A), 6-3-2024; Ord. No. 4873, § 4, 6-16-2025; Ord. No. 4907, § 2, 1-5-2026)

Ask a question about Nampa law

Corpus searches the Nampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.