10-27-10. - Financial security and guarantee.

Final plat signature by the City of Nampa shall not occur in an approved residential, commercial, industrial or other subdivision until such time as the water lines, fire hydrants, required landscaping, sewer, curb, gutter and sidewalk, property pins, pressure irrigation and stormwater systems are fully constructed and tested with passing results for and within the entire subdivision and the street(s) within the same subdivision is(are) prepared and fully ready for paving. The water lines must be fully and completely tested with passing results, activated and provide sufficient water for fire suppression as noted in subsection 10-27-6.K of this chapter. As an exception, security by way of cash deposit or letter of credit may be provided for paving, required common lot and landscape buffer strips, and other minor miscellaneous improvements. Regarding outstanding paving: The developer shall provide the city with either an approved one-year irrevocable letter of credit or cash deposit at the percentage listed below of the estimated cost of the required road surfacing which shall be filed with the public works department. The paving so covered shall be placed within six months from the date of recording of the final plat; provided, the council may extend the period by one month intervals upon showing of just cause to the council by the subdivider. Landscaping that is integral to the stormwater system (including that necessary to meet best management practices and the City of Nampa standards/requirements for stormwater collection, transportation, treatment and disposal) is exempt from financial security requirements and must be substantially complete and functioning for consideration to be given to financial security for the other landscape features. Regarding outstanding required common lot landscaping and buffer landscaping: The developer shall provide the city with either an approved one-year irrevocable letter of credit or cash deposit at the percentage listed below of a developer's contract bid for the estimated cost of the required landscaping which shall be filed or deposited with the city engineering division. The landscaping so covered shall be placed within six months from the date of recording of the final plat; provided, the council may extend the period by one month intervals upon showing of just cause to the council by the subdivider. In the event that all landscaping or paving is not complete within the required six month time frame, the city may withhold all remaining building permits and execute said letter of credit or cash monies to complete any outstanding required improvements. Once building construction within a subdivision has begun, it shall be halted once 25 percent of the lots in that phase have received or been issued building permits for primary structures (e.g., houses). In order for any further building permits to be issued, remaining street paving and landscaping pertaining to the subdivision, as required by the city engineering department or fire department, shall be completed. Minimum Financial Security Required by Stage Stage | Percentage of Remaining Improvements Prior to final plat signature by the City | 150 percent "Punch list" items | 200 percent All monetary amounts and estimates to complete must be approved by the city engineer or his representative. The owner and/or subdivider shall guarantee all public subdivision improvements for a one-year period following the date of acceptance by the city. Any defects discovered or repairs required during the one-year guarantee period, due to faulty workmanship or materials shall be corrected at the expense of the owner and/or subdivider, and shall be completed in a timely manner as directed by the City of Nampa, but in no case shall the correction period exceed 90 days.

(Ord. No. 4617, § 1(Exh. A), 10-4-2021; Ord. No. 4702, § 1(Exh. A), 12-5-2022)