10-27-3. - Final plat application form, content and process.

After approval (or conditional approval) of a preliminary plat, the subdivider may cause the subdivision, or any part thereof, to be surveyed and a final plat prepared in accordance with the preliminary plat as approved. The subdivider shall file with the planning and zoning department requisite final plat application materials as hereafter denoted: A. Form of presentation. 1. A completed subdivision application form and PDF copy of the following: a. Final plat with an indication of the square footage of each and every proposed lot 1. b. Construction drawings. c. A legal description of each phase proposed for final review. d. A landscape plan. 2. The plat shall be so drawn that the top of the drawing faces generally north. All lines, dimensions and markings shall be made on the plat in accordance with provisions of Idaho Code. The actual map shall be made on a scale of no less than 100 feet to the inch and shall clearly show all details. 3. The final plat drawings and plans for subdivisions proposed in the city its impact area shall be submitted in digital form and to a datum approved as specified in the manuals referenced in subsection 10-27-1.F of this chapter. This will assist with the updating of the city "base maps," record drawings, and addressing. 4. Requisite fees. B. Contents. The following information shall be contained upon the final plat to be filed: 1. The name and general location of the subdivision in bold letters at the top of the sheet. (The name of the subdivision must not bear the name of any town or plat in Canyon County.) 2. North arrow and scale of the plat. 3. Name, address and official seal of the registered land surveyor preparing the plat. 4. The boundaries must be accurately drawn showing the proper bearings and dimensions of all boundary lines of the subdivision and where possible the bearings and coordinate system for the plat shall be on the Idaho state modified coordinate system. These lines should be heavier than street and lot lines. 5. Boundaries of the tract to be subdivided fully balanced and closed, showing all bearings and distances determined by an accurate survey in the field. All dimensions, both linear and angular, are to be staked in the field by accurate control survey, which must balance and close within a limit of one in 10,000. If staking is to be provided after the recording of the plat, the subdivider shall meet all requirements established by Idaho Code title 50, chapter 13. 6. The names, widths, lengths, bearings, curve data on centerlines of proposed streets, alleys and easements desired or necessary; the boundaries, bearings and dimensions of all parcels within the subdivision intended to be dedicated to the use of the public; and the sizes, lines, dimensions, curve data and number of all lots, blocks and/or parts reserved or excepted for any reason within the subdivision. 7. The widths of abutting streets and alleys, and their names (if they have any), the names and boundaries of all subdivisions which have been previously recorded and are adjacent thereto, must be shown upon the plat offered for record. These adjacent subdivisions shall be shown as dotted lines to show their relationship to the plat offered for record. If adjoining land is unplatted it should be indicated as such. 8. All linear dimensions shall be calculated to the nearest 0.01 of a foot and all bearings shall be calculated to the nearest ten seconds of arc. All curves shall be defined by the radius, central angle, tangent, arc, chord distances and chord bearings. The description and location of all monuments shall be shown. Monuments shall be set in accordance with Idaho Code title 50, section 13. 9. All lots and blocks shall be numbered throughout the plat in accordance with Idaho Code. 10. Any excepted parcels within the plat boundaries shall show all bearings and distances, determined by an accurate survey in the field. 11. Location and description of cardinal points to which all dimensions, angles, bearings and similar data on the plat shall be referenced. In addition to the requirements of Idaho Code title 50, chapter 13, the exterior boundary of the subdivision shall be tied to not less than two recognized county or city survey monuments. 12. The datum utilized for the final plat and construction drawings shall be stated on both the final plat and construction drawings. 13. The required forms shall be lettered on the plat for the following: registered land surveyor's "certificate of survey;" owner's dedication certificate with notary public acknowledgment; the approval of the mayor and council as attested by the clerk; approval by the city engineer; approval by the planning and zoning commission; and other certificates as required by Idaho code. C. Additional materials. The final plat submittal shall also be accompanied by the following: 1. Private restrictions. Copies of any private restrictions and/or covenants proposed to be recorded for the purpose of providing regulations governing the use, building lines, open spaces or other aspects of development and use. This includes, but is not limited to, all easements to be recorded as part of and/or intended to service the development. 2. Lot area. Submittals shall include areas of all lots. Lots and density for a standard subdivision shall adhere to the following lot size and density requirements: Base lot: The cumulative area of the parcel(s) where the multi-unit structure resides. When developing townhouses the base lot shall be a lot size within the minimum and maximum range on the chart. From this proposed base lot the townhouse units can be subdivided according to the product type to provide single-family housing units. Single-Family Residential Zoning Districts - Lot Size and Density - Standard Subdivision Future Land Use Designation | Zoning District | Min Lot Size per DU | Max Lot Size per DU | Minimum Property Width (feet) | Required Mean Property Depth (feet) LDR | RS-22 | 22,000 | 43,560 | 80 | 80 LDR | RS-18 | 18,000 | 36,000 | 80 | 80 LDR | RS-15 | 15,000 | 30,000 | 60 | 80 LDR | RS-12 | 12,000 | 24,000 | 60 | 80 MDR | RS-8.5 | 8,500 | 17,000 | 50 | 80 MDR | RS-7 | 7,000 | 14,000 | 40 | 70 MDR | RS-6 | 6,000 | 12,000 | 30 | 60 MDR | RS-4 | 4,000 | 8,000 | 30 | 50 Other Zoning Districts - Lot Size - Standard Subdivision Future Land Use Designation | Zoning District Product Type | Minimum Base Lot Size | Maximum Base Lot Size MDR | RMU | RML & RP Single-Family | 6,000 s.f. | 8,000 s.f. RD Single-Family | 6,000 s.f. | 10,000 s.f. RD Two-Family (Duplex) | 6,000 s.f. | 12,000 s.f. RD Two-Unit Townhouse | 6,000 s.f. | 12,000 s.f. RD Three-Unit Townhouse | 9,000 s.f. | 15,000 s.f. RD Four-Unit Townhouse | 12,000 s.f. | 18,000 s.f. HDR | RD Two-Unit on one parcel (or townhouse) | 6,000 s.f. | 12,000 s.f. RD Three-Units on one parcel (or townhouses) | 9,000 s.f. | 15,000 s.f. RD Four-Units on one parcel (or townhouses) | 12,000 s.f. | 18,000 s.f. HDR | RMU | CMU | RML & RP Two-Unit Townhouse | 6,000 s.f. | 10,000 s.f. RML & RP Three-Unit Townhouse | 7,350 s.f. | 15,000 s.f. RML & RP Four-Unit Townhouse | 8,700 s.f. | 18,000 s.f. RML & RP Four + Unit Townhouse | 8,700 s.f. + 1,350 s.f. per DU > 4 | 18,000 s.f. + 3,000 s.f. > 4 RML & RP Duplex | 6,000 s.f. | 10,000 s.f. HDR | CMU | RMH Two-Unit Townhouse | 6,000 s.f. | 9,000 s.f. RMH Three-Unit Townhouse | 6,500 s.f. | 12,000 s.f. RMH Four-Unit Townhouse | 7,000 s.f. | 14,000 s.f. RMH Four + Unit Townhouse | 7,000 s.f. + 500 s.f. per DU > 4 | 14,000 s.f. + 2,500 s.f. per DU > 4 a. Buildable lot size and density requirements. New lots created on or after October 4, 2021 by an administrative lot split or through a subdivision of the land must conform to the minimum and maximum lot size and density requirements established for the zoning district assigned to that parcel in order to be considered a 'buildable' lot. 3. Water and sewer facilities design. Design approval by the appropriate health agency, if other than the city, of the proposed water and sewer facilities. 4. Improvement drawings. Construction drawings and specifications prepared by a properly licensed engineer with details rendered in conformance with the manuals referenced in subsection 10-27-1.F of this chapter. A general utility sheet showing all utilities combined (i.e., sewer, water, storm drainage, street lighting, etc.) shall be included in the set. 5. Landscape plan. See NCC 10-33-2.H.4 and 5 for landscape plan set and open space plan requirements. a. A copy of the landscape plan and open space plan (drawn in accordance with regulations contained in chapter 33 of this title), as submitted to the city's planning and zoning department, shall be included in the improvement drawings package. 6. General. The drawings shall include sufficient, accurate topographic detailing of adjacent properties and roadway to adequately depict or address impact of the development (e.g., span 50 feet beyond edge of properties' boundaries). All locations of regulatory signs, as classified by the "Manual on Uniform Traffic Control Devices" (MUTCD), shall be shown on the roadway plan sheets included as a part of the improvement drawings. 7. Ownership and maintenance agreement. Ownership and maintenance agreement for all common areas, access easements or areas of joint ownership. D. Final plat review and approval procedures. 1. The final plat, after having been prepared in accordance with Idaho Code requirements and the provisions set forth herein, shall be submitted to the planning and zoning director or his designee within 18 months after approval of the preliminary plat, unless a time extension has been granted by the planning commission. 2. Final plat submission shall be made to the planning and zoning director or his designee for his review at least 41 calendar days before the planning and zoning commission meeting at which the plat is to be considered. The planning and zoning commission shall act on the application for final plat approval as a business item on its agenda within 30 calendar days from the first meeting at which the final plat was formally presented unless all concerned agree upon an extension of time. 3. The planning and zoning director or his designee shall transmit one copy of the final plat and/or improvement drawing(s) for review by departments and agencies, or others as may be deemed necessary to ensure compliance with the approved preliminary plat. If no replies and/or preliminary staff reports are received from any of the various departments or interested agencies within 30 calendar days from the date of transmittal, approval of the final plat by such department or agency shall be considered granted. 4. In the event the final plat does not substantially conform to the approved preliminary plat based on considerations listed in section 10-27-2 of this chapter, the planning and zoning director or his designee shall so inform the subdivider and proceed to assign the final plat to the planning and zoning commission agenda for its consideration of the plat as a revised/amended or new preliminary plat, as deemed most appropriate. 5. The Planning and zoning commission may consider a final plat for approval, along with the improvement drawings associated with said plat. In all cases the city council reserves the right to impose or sustain any reasonable condition it so deems necessary. 6. Notice of the approval or disapproval of the planning and zoning commission along with any other pertinent comments and/or recommended conditions shall be submitted in writing to the subdivider and to the mayor and council. If approved, the final plat shall have endorsed thereon the required approvals. The council shall review the plat and consider the planning and zoning commission's recommendations at the next available city council meeting. If approved, the final plat shall have endorsed thereon the required approvals. If the council, however, receives the final plat for review because of an appeal being filed on said plat, the council shall decide whether to approve the plat. In all cases the city council reserves the right to impose or sustain any reasonable condition it so deems necessary. 7. At the time of approval and contingent upon the recording of the final plat, the city shall accept the dedications shown thereon. 8. Upon final approval and obtaining all required signatures the subdivider shall take the final plat to the county recorder for recording. One reproducible copy, in mylar, of the plat must be prepared and filed with the city engineering division. The county recorder shall have attested the content on the reproducible copy to be the same that has been recorded with the county. The first final plat of a subdivision development shall be filed with the county recorder within 12 months after approval of the council to vest an approved preliminary plat, otherwise such approval shall become null and void unless an extension of time is applied for and granted. The commission may grant one year extensions for the first final plat of a subdivision development. Up to three extensions may be requested. Once a preliminary plat is vested by the first phase, no other final plat extensions shall be required.

(Ord. No. 4617, § 1(Exh. A), 10-4-2021; Ord. No. 4671, § 1(Exh. A), 5-16-2022; Ord. No. 4702, § 1(Exh. A), 12-5-2022; Ord. No. 4727, § 1(Exh. A), 4-3-2023; Ord. No. 4777, § 1(Exh. A), 12-18-2023; Ord. No. 4873, § 17, 6-16-2025)