For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-34-5 — Committee review procedure

Code of Ordinances of the City of Nampa, Idaho (Codified through Ordinance No. 4907, adopted January 5, 2026 (Supp. No. 16, Update 1)) · Nampa Code of Ordinances § 10-34-5

Corpus is an independent public-information project, not the official City of Nampa website. Stable reference: corpuslaw.us/code/d5d444c6-f953-4c7a-83a8-afcc30817835

10-34-5. - Committee review procedure.

A. Scheduling design committee review. Upon receipt of an application for design review, or upon the determination of the director, that an application should be referred directly to the committee, the director shall schedule the application to be considered at the next available committee meeting. The director may extend the review time for applications that are unusually large or complicated. B. Staff report. At least one week prior to the review before the committee, staff shall prepare and submit a staff report to the committee and the applicant. The staff report shall summarize the application and set forth which elements of the building meet design criteria and which elements do not. When preparing the staff report for an exception request, staff shall indicate that all other portions of the required code sections have been met and only outline items that effect the specific exception request. C. Conducting review. The chair of the committee shall ask staff to summarize the application and staff's findings. After the presentation by staff, the chair shall ask the applicant to represent the application, respond to the staff report, and answer questions from the committee. Following the presentation and report, the committee shall deliberate about the application. The committee may ask the applicant to address specific issues, including the applicant's response to any design issues raised by the committee. At the conclusion of its deliberations, the committee shall render its decision. The committee shall be empowered to interpret design standards and to make exceptions to standards, provided such exceptions shall not allow variance to other, nondesign standards-based zoning code regulations, and shall not fail to maintain overall compliance with the design objectives and goals of the city. When reviewing industrial design review exception requests, the committee shall only review that specific exception requested.

(Ord. No. 4617, § 1(Exh. A), 10-4-2021; Ord. No. 4728, § 1(Exh. A), 4-3-2023)

Ask a question about Nampa law

Corpus searches the Nampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.