9-6-3. - Definitions.
For the purposes of this chapter, the following shall mean: Best management practices (BMPs): Schedules of activities, prohibitions of practices, general good housekeeping practices, pollution prevention and educational practices, maintenance procedures, and other management practices to prevent or reduce the discharge of pollutants directly or indirectly to storm water, receiving waters, or storm water conveyance systems. BMPs also include treatment practices, operating procedures, and practices to control site runoff, spillage or leaks, sludge or water disposal, or drainage from raw materials storage. Clearing: Any activity that removes the vegetative surface cover. Drainageway: Any channel that conveys surface runoff throughout the site. Erosion and sediment control plan: A set of plans indicating the specific measures and sequencing to be used controlling sediment and erosion on a development site before, during and after construction. Erosion control: Measures that prevent erosion. Grading: Excavation or fill of material, including the resulting conditions thereof. Perimeter control: A barrier that prevents sediment from leaving a site either by filtering sediment laden runoff, or diverting it to a sediment trap or basin. Phasing: Clearing a parcel of land in distinct phases, with the stabilization of each phase before the clearing of the next. Responsible person: Any foreman, superintendent, project manager, or other person with operational control over site activities and day to day operational control over plan requirements and permit conditions at the site of any construction activity. The responsible person shall possess a current and valid Boise City certificate of training or equivalent. Sediment control: Measures that prevent eroded sediment from leaving the site. Site: A parcel of land, or a contiguous combination thereof, where grading work is performed as a single unified operation. Site development permit: A permit issued by the municipality for the construction or alteration of ground improvements and structures for the control of erosion, runoff and grading. Stabilization: The use of practices that prevent exposed soil from eroding. Watercourse: Any body of water, including, but not limited to, lakes, ponds, rivers, streams, and bodies of water. Waterway: A channel that directs surface runoff to a watercourse, or to the public storm drain.
(Ord. 3432, 3-7-2005)
Ask a question about Nampa law
Corpus searches the Nampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.