§ 9-6-6 — General requirements and prohibitions

Code of Ordinances of the City of Nampa, Idaho (Codified through Ordinance No. 4907, adopted January 5, 2026 (Supp. No. 16, Update 1)) · Nampa Code of Ordinances § 9-6-6

Corpus is an independent public-information project, not the official City of Nampa website. Stable reference: corpuslaw.us/code/f991de4c-0cfe-4be1-9860-3f7e14e42a6f

9-6-6. - General requirements and prohibitions.

Grading, erosion control practices, sediment control practices, and waterway crossings on all construction sites, regardless of size, shall be maintained from the time of initial clearing through final stabilization. The requirements of this section and the design criteria set forth in the most recent version of IDEQ's Catalog of Storm Water Best Management Practices and meet the requirements of City of Nampa "Development Information Manual" and shall be adequate to prevent transportation of sediment from the site to the satisfaction of the Nampa Public Works Department. A. Clearing and grading. 1. Clearing and grading shall not be permitted except when in compliance with all other chapters of this Code. 2. Clearing techniques that retain natural vegetation and retain natural drainage patterns, as described in the IDEQ's Catalog of Storm Water Best Management Practices, shall be used to the satisfaction of the Nampa Public Works Department. 3. Phasing shall be required on all sites disturbing greater than 30 acres, with the size of each phase to be established at plan review and as approved by the Nampa Public Works Department. 4. Clearing, except that necessary to establish sediment control devices, shall not begin until all sediment control devices have been installed and have been stabilized. 5. Cut and fill slopes shall be no greater than three to one, except as approved by the Nampa Public Works Department to meet other community or environmental objectives. B. Control standards. 1. Soil must be stabilized within ten days of clearing or inactivity in construction. 2. If vegetative erosion control methods, such as seeding, have not become established within two weeks, the Nampa Public Works Department may require that the site be reseeded, or that a nonvegetative option be employed. 3. Techniques shall be employed to prevent the blowing of dust or sediment from the site. 4. When in-channel work is conducted, the channel shall be stabilized before, during and after work. 5. Stabilization adequate to prevent erosion must be provided at the outlets of all pipes and paved channels. 6. A temporary access road shall be provided at all sites. 7. A vehicle wash down/cleanup area shall be provided at all sites to remove mud and prevent tracking onto roadways. 8. Other measures may be required at the discretion of the Nampa Public Works Department in order to ensure that construction vehicles do not track sediment onto public streets or sediment is not washed into storm drains.

(Ord. 3432, 3-7-2005; Ord. No. 4873, § 3, 6-16-2025)

Ask a question about Nampa law

Corpus searches the Nampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.