§ 13.20.290 — Periodic compliance report

Code of Ordinances of the City of Post Falls, Idaho (Codified through Ordinance No. 1549, enacted February 17, 2026. (Supp. No. 5)) · Post Falls Code of Ordinances § 13.20.290

Corpus is an independent public-information project, not the official City of Post Falls website. Stable reference: corpuslaw.us/code/44f5eb4b-62c7-4f04-9d35-76b3cb9aae93

13.20.290. - Periodic compliance report.

A. Except as specified in section 13.20.290.C, all Significant Industrial Users must, at a frequency determined by the city, submit no less than twice per year, on dates specified to the user, reports indicating the nature, concentration of Pollutants in the Discharge which are limited by Pretreatment Standards and measured or estimated average and maximum daily flows for the reporting period. In cases where the Pretreatment Standard requires compliance with a Best Management Practice (BMP) or pollution prevention alternative, the user must submit documentation as stipulated by the city or the Pretreatment Standard necessary to determine the compliance status of the user. B. The city may authorize an Industrial User subject to a Categorical Pretreatment Standard to forego sampling of a Pollutant regulated by a Categorical Pretreatment Standard if the Industrial User has demonstrated through sampling and other technical factors that the Pollutant is neither present nor expected to be present in the Discharge, or is present only at background levels from intake water and without any increase in the Pollutant due to activities of the Industrial User. See 40 CFR 403.12(e)(2). This authorization is subject to the following conditions: 1. The waiver may be authorized where a Pollutant is determined to be present solely due to sanitary Wastewater discharged from the facility provided that the sanitary Wastewater is not regulated by an applicable Categorical Standard and otherwise includes no process Wastewater. 2. The monitoring waiver is valid only for the duration of the effective period of the individual Wastewater Discharge Permit, but in no case longer than five (5) years. The user must submit a new request for the waiver before the waiver can be granted for each subsequent individual Wastewater Discharge Permit. See section 13.20.190 H. 3. In making a demonstration that a Pollutant is not present, the Industrial User must provide data from at least one sampling of the facility's process Wastewater prior to any treatment present at the facility that is representative of all Wastewater from all processes. 4. The request for a monitoring waiver must be signed in accordance with section 13.20.030 by an Authorized Representative of the Industrial User and must include the certification statement in section 13.20.200 (40 CFR 403.6(a)(2)(ii)). 5. Non-detectable sample results may be used only as a demonstration that a Pollutant is not present if the EPA approved method from 40 CFR 136 with the lowest minimum detection level for that Pollutant was used in the analysis. 6. Any grant of the monitoring waiver by the city must be included as a condition in the user's permit. The reasons supporting the waiver and any information submitted by the user in its request for the waiver must be maintained by the city for three (3) years after expiration of the waiver. 7. Upon approval of the monitoring waiver and revision of the user's permit by the city, the Industrial User must certify on each report with the statement in section 13.20.200 that there has been no increase in the Pollutant in its Waste stream due to activities of the Industrial User. 8. In the event that a waived Pollutant is found to be present or is expected to be present because of changes that occur in the user's operations, the user must immediately comply with the monitoring requirements of section 13.20.290.A, or other more frequent monitoring requirements imposed by the city and notify the city. 9. This provision does not supersede certification processes and requirements established in Categorical Pretreatment Standards, except as otherwise specified in the Categorical Pretreatment Standard. C. The city may reduce the requirement for periodic compliance reports [see section 13.20.290.A (40 CFR 403.12(e)(1))] to a requirement to report no less frequently than once a year, unless required more frequently in the Pretreatment Standard or by the Approval Authority, where the Industrial User's total categorical Wastewater flow does not exceed any of the following: 1. One one-hundredths (0.01) percent of the design dry weather hydraulic capacity of the POTW, or five thousand (5,000) gallons per day, whichever is smaller, as measured by a continuous effluent flow monitoring device unless the industrial Discharges in batches; 2. One one-hundredths(0.01) percent of the design dry weather organic treatment capacity of the POTW; or 3. One one-hundredths (0.01) percent of the maximum allowable headworks loading for any Pollutant regulated by the applicable Categorical Pretreatment Standard for which approved local limits were developed by the POTW in accordance with 40 CFR 403.15(c) and paragraph D. of this section. Reduced reporting is not available to Industrial Users that have, in the last two (2) years, been in significant non-compliance. In addition, reduced reporting is not available to an Industrial User with daily flow rates, production levels, or Pollutant levels that vary so significantly that, in the opinion of the city, decreasing the reporting requirement for this Industrial User would result in data that are not representative of conditions occurring during the reporting period. D. Any Industrial User subject to equivalent mass or concentration limits established by the city or by unit production limits specified in the applicable Categorical Standards must report production data as outlined in section 13.20.280 B. of this chapter. E. If the city calculated limits to factor out dilution flows or non-regulated flows, the Industrial User will be responsible for providing flows from the regulated process flows, dilution flows and non-regulated flows. F. Flows must be reported based on actual measurement, provided, however, that the city may accept reports of average and maximum flows estimated by verifiable techniques if the city determines that an actual measurement is not feasible. G. Discharges sampled must be representative of the Industrial User's daily operations and samples shall be taken in accordance with the requirements specified in section 13.20.380 of this chapter. H. The city may require reporting by Industrial Users that are not required to have an Industrial Wastewater Discharge Permit if information or data is needed to establish a Sewer charge, determine the treatability of the effluent, or determine any other factor which is related to the operation and maintenance of the Sewer system. I. All periodic compliance reports must be signed and certified in accordance with section 13.20.200 of this chapter. J. The city may require self-monitoring by the Industrial User or, if requested by the Industrial User, may agree to perform the periodic compliance monitoring needed to prepare the periodic compliance report required under this section. If the city agrees to perform such periodic compliance monitoring, it may charge the Industrial User for such monitoring, based upon the costs incurred by the city for the sampling and analyses. Any such charges will be added to the normal Sewer charge and will be payable as part of the Sewer bills. The city is under no obligation to perform periodic compliance monitoring for an Industrial User. K. All Wastewater samples must be representative of the user's Discharge. Wastewater monitoring and flow measurement facilities must be properly operated, kept clean, and maintained in good working order. The failure of a user to keep its monitoring facility in good working order will not be grounds for the user to claim that sample results are unrepresentative of its Discharge. L. If a user subject to the reporting requirement in this section monitors any regulated Pollutant at the appropriate sample location more frequently than required by the city, using procedures prescribed in section 13.20.380, the results of this monitoring must be included in the report.

(Ord. 1460 § 1, 2022)