§ 30-414 — As-Built Revised Permit Drawings; Deviation from Permit

Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 30-414

Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/b8398601-463a-4095-9250-b41733034f7c

Sec. 30-414. - As-Built Revised Permit Drawings; Deviation from Permit.

(a) As-built Required. In the event that the actual locations of any facilities deviate in any material respect from the locations identified in the plans, drawings and specifications submitted with the permit application, the permittee shall submit a revised set of drawings or plans to the Director of Public Works within ninety (90) days after the completion of the permitted work in the format required by the City. The revised drawings or plans shall specifically identify where the locations of the actual facilities deviate from the locations approved in the permit. (b) Deviations from Approved Plans. If any deviation from the permit also deviates from the requirements of this Article, then the permittee shall do one of the following: (1) remove the facility from the right-of-way; or (2) modify the facility so that it conforms to the permit and submit revised drawings or plans therefor; or (3) obtain permission from the Director of Public Works to maintain the condition constituting the deviation by demonstrating to the Director that the deviation meets the conditions for granting a variance under Section 30-413.

(C.B. No. 2013-167, § 1(Exh. A), 9-17-13)

Ask a question about Champaign law

Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.