For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-424 — Clean-up and Restoration

Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 30-424

Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/d2b22938-baa7-49bf-bbbd-41be698eb2fc

Sec. 30-424. - Clean-up and Restoration.

(a) Requirement for Clean-up. The permittee user shall remove all excess material and restore all turf and terrain and other property within fourteen (14) days after any portion of the rights-of-way are disturbed, damaged or destroyed due to construction or maintenance by the user, all to the satisfaction of the City. This includes restoration of entrances and side roads. Restoration of roadway surfaces shall be made using materials and methods approved by the Director of Public Works. Such cleanup and repair may be required to consist of backfilling, regrading, reseeding, resodding, or any other requirement to restore the right-of-way to a condition substantially equivalent to that which existed prior to the commencement of the project, provided that there is no requirement to replace with any plant material other than turf grass and trees. The time period provided in this section may be extended by the Director of Public Works for good cause shown. (b) City to Restore. If necessary, the City may complete the clean-up and restoration. The permitee shall pay the cost to complete the clean-up and restoration, including an administrative fee, within twenty-one (21) days after a bill is sent to the permittee. (c) Remedies. If, after receiving notice from the Director of Public Works or a designated representative: (1) Any person fails to restore the public right-of-way within the time period set by the Director of Public Works or a designated representative to the same condition as it was before the surface was disturbed, or to such other condition as approved by the Director of Public Works or a designated representative; or (2) If the purported restoration of the public right-of-way fails or was defectively restored and such defect becomes evident within a twelve-month period after such excavation; or (3) If the person has failed to restore such public right-of-way to the satisfaction of the Director of Public Works or a designated representative within the time period set by the Director of Public Works or a designated representative, the City may perform or cause such restoration work to be performed and charge the whole cost thereof to the person holding said permit. Such costs shall include an overhead charge based on the personnel involved in administering this section, as determined in writing by the Director of Finance. The amount so charged shall be billed to said person. The amount billed shall be paid to the City within twenty-eight (28) days after the date of the bill.

(C.B. No. 2013-167, § 1(Exh. A), 9-17-13)

Ask a question about Champaign law

Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.