For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37-619.5 — Overall Development Plan Approval process

Code of Ordinances of the City of Champaign, Illinois (Codified through C.B. No. 2026-125, adopted August 18, 2026 (Supp. No. 81, Update 1)) · Champaign Code of Ordinances § 37-619.5

Corpus is an independent public-information project, not the official City of Champaign website. Stable reference: corpuslaw.us/code/cc510030-74a9-4a4e-8aef-1034291113d3

Sec. 37-619.5. - Overall Development Plan Approval process.

Any person or entity seeking approval of any development in the Curtis Road Interchange Area Overlay District shall comply with each of the procedures or steps identified in Table XI-D in the sequence provided in said table, and comply with the specifications for submittals in Table XI-E. Table XI-E: Application Checklist for Approvals for Overall Development Plans Within the Curtis Road Interchange Area Overlay District Specifications Overall Development Plan | The area for development includes a minimum of 20 acres. Overall Development Plans for parcels less than 20 acres in size as of October 1, 2015 must be for a minimum size of the entire parcel or lot as of that date. Shall include design drawings depicting all contents listed in section 31-312, lot lines, stormwater detention, existing and proposed zoning and elements in accordance with Table XI-C - Design Requirements for the Curtis Road Interchange Area Overlay District, Stage 1: Overall Development Plan. The document should include the following: (a) Legal description and property survey by a Registered Land Surveyor of the entire area within the development; (b) Survey data sufficient to reproduce any line or reestablish any monument; (c) All highways, streets, alleys, blocks, lots, parcels, public grounds, easements, and rights-of-way; (d) The length of boundary lines of all streets, alleys, blocks, lots, required setbacks and yards, public grounds, easements, and rights-of-way and information sufficient to derive the length of these lines by simple calculation; (e) The width of all rights-of-way, easements, and location of utilities, including sanitary sewer; (f) All street connections to arterial streets and adjacent sites. Signed Annexation Agreement | For development approval on a tract that is not yet within the corporate limits of the City, an Annexation agreement drafted by City staff and signed by the landowners. Phasing Plan | Shows anticipated order of construction of infrastructure, lots and elements required in accordance with the Overall Development Plan with timeline. Outdoor Gathering Space Design Concept and Maintenance Plan | A conceptual design for the required Outdoor Gathering Space, including seating, lighting, general landscape materials and amenities, as well as an ownership and maintenance plan for the space shall be depicted on or attached to the Overall Development Plan. Traffic Impact Analysis | In accordance with the Champaign Manual of Practice, a Traffic Impact Analysis for the site, including signalization plan for intersections onto Curtis Road and arterial roads if determined through the analysis. Stormwater Management Plan | In accordance with the Champaign Manual of Practice, a Stormwater Management Plan showing the location and capacity of all detention basins and Low Impact Design features on the site.

(C.B. No. 2018-149, § 1(Exh. A), 9-18-18) (C.B. No. 2017-014, § 6(Att. F), 2-7-17; C.B. No. 2018-062, § 2(Exh. A), 5-1-18; C.B. No. 2018-149, § 1(Exh. A), 9-18-18)

Ask a question about Champaign law

Corpus searches the Champaign sections it holds and shows the ones that match, with their citations. Free, no sign-in.