§ 18-29-603.3.5 — Construction of meter vaults
Municipal Code of Chicago (2026 S-74, current through Council Journal of June 17, 2026) · Municipal Code of Chicago § 18-29-603.3.5
Corpus is an independent public-information project, not the official City of Chicago website. Stable reference: corpuslaw.us/code/fb5390d2-2760-465b-93d1-9b16ffc98c48
18-29-603.3.5 Construction of meter vaults.
Wherever a water meter is installed in the ground, either inside or outside of any building or structure on public or privately owned property, it shall be enclosed in a meter vault. Such vault shall be built of hard pressed common brick or portland cement concrete blocks laid up in portland cement mortar, poured portland cement concrete, extra heavy, salt-glazed vitrified clay tile pipe, portland cement concrete pipe, or equally durable material. This meter vault shall be provided with a removable cover. Each meter vault shall be built to conform to the specifications and dimensions for meter vaults issued by the Commissioner of Water Management. (Amend Coun. J. 11-8-12, p. 38872, § 345; Amend Coun. J. 10-14-21, p. 37722, Art. VI, § 4; Amend Coun. J. 12-14-22, p. 58278, Art. VI, § 7; Amend Coun. J. 4-19-23, p. 62477, § 1)
Ask a question about Chicago law
Corpus searches the Chicago sections it holds and shows the ones that match, with their citations. Free, no sign-in.
