Sec. 82-136. - Permit.

(a) Required; estimate of costs. A permit is required for any person to open any street, sidewalk, alley, avenue, or public place. Before a permit shall be granted to any person to open any street, sidewalk, alley, avenue, or public place for any purpose, an estimate of the cost of inspection, as provided in this section, and of restoring the pavement and the surface of the street, sidewalk, alley, avenue or public place to a condition equally as good as before it shall have been so opened, to the satisfaction of the superintendent of public works, with a fair additional sum as margin for contingent damages to be determined by the superintendent of public works, shall be made by the superintendent. The permit shall be issued and transmitted to the town collector who, before delivering the permit, shall collect the amount of the estimate and the fee for the permit. (b) Bond required. No permit shall be issued to any person permitting or allowing the obstruction of any street or sidewalk or tearing up, removing or repairing of any street or sidewalk or any part thereof until the person making application for such permit shall first have executed to the town a good and sufficient bond in an amount to be fixed by the board of trustees, in no case to be less than $10,000.00, and with sureties to be approved by the board of trustees. The bond shall be conditioned to indemnify, save and keep harmless the town from any and all loss, cost, damage, expense or liability of any kind whatsoever which the town may suffer or which the town may be put to or which may be recovered from the town from or on account of the issuance of such permit or from or on account of any act or thing done by virtue of the authority given in such permit or for any damage, loss or expense to any person caused by or on account of the obstruction of any such street or sidewalk or by the tearing up, repairing or removing of such street or sidewalk or part thereof. However, this subsection shall not apply to the construction of private driveways or sidewalk aprons where there is no interference with the present street or sidewalk. (c) Specifications to accompany application. The board of trustees shall not issue any permit for the opening of any street, alley or public way by any person until it shall have been fully advised of the time, place and character of such opening and the purpose thereof, and every application for a permit shall be accompanied by a plat or pencil tracing or sketch showing the location, character and dimensions of the proposed opening for the installation of new work or the location and character of the alterations involving changes in the location of pipes, conduits, wires or other conductors. (d) Inspections. All work done under the authority of such permit shall be supervised and inspected by a town inspector to be designated by the board of trustees. Immediately after the completion of the work is done under such authority, the superintendent of public works shall, with town workers, forthwith put back and restore and replace in proper shape and condition any pavement displaced because of such work and shall restore and replace the surface of any street or alley or other public way which may be opened or otherwise disturbed; all of the work to be done in such manner as shall be satisfactory to the board of trustees, and as will leave the street in a condition equally as good as before it was opened or disturbed under such authority. However, when such permit is granted to any person to open any street, sidewalk, alley, avenue or public place when such street, sidewalk, alley, avenue or public place is still under reserve of the guarantee period of the contract under which such street, sidewalk, alley or public place was improved, such replacement or restoration shall be made by the contractor in accordance with the terms of his contract for the construction and maintenance of such improvement. (e) Determination of costs. The cost of the supervision and inspection and of restoring the pavement and street as provided in this section shall be determined by the board of trustees and shall be deducted from the amount deposited with the town collector as provided in this section.

(Ord. of 1-6-1930, §§ 21, 23; Ord. of 4-30-1931, § 22; Code 1958, §§ 32-69—32-71)