Sec. 82-139. - Time limits.

(a) If any person desires to lay any pipes, conduits, tunnels, wires or conductors or do any other underground work whatever in any street which is to be improved by special assessment, such person shall lay such pipes, conduits, tunnels, wires or conductors and install such other underground work within 45 days after the confirmation of the assessment for the paving of such street if such assessment is confirmed during the months of June or July. If such assessment is confirmed during any other month, such pipes, conduits, tunnels, wires or conductors shall be laid and such other underground work installed within 60 days after the date of confirmation of such assessment. However, where such assessment is confirmed during the months of November, December, January and February, such period of 60 days shall be computed from March 1 following. Whenever the public necessities require it, the board of trustees may, in its discretion, grant to such person a period of time not to exceed 15 days, in addition to periods of 45 days and 60 days prescribed in this subsection, within which to lay such pipes, conduits, tunnels, wires or conductors and install such other underground work. If such street is improved by any other method than by special assessment, such pipes, conduits, tunnels, wires or conductors shall be laid and any other underground work shall be installed before the date of the completion of such improvement. (b) If such pipes, conduits, tunnels, wires or conductors are not laid or if such other underground work is not done within the time stated in subsection (a) of this section, such person shall, except as provided in this subsection, lay or do the laying between the lot and curblines or in the nearest alley contiguous to such paved street during the period of five years from and after the date of the acceptance of such improvement in each street by the proper authorities of the town, provided that nothing in this subsection shall preclude the following: (1) The laying of service pipes, service conduits, service wires or service conductors used in connecting lots abutting on such street with the pipes, conduits, wires or conductors laid longitudinally in such streets. (2) The repairs to pipes, conduits, tunnels, wires or conductors or to service pipes, service conduits, service wires or service conductors in such streets. (3) The laying of pipes, conduits, tunnels, wires or conductors or the doing of any other underground work in that portion of such street which lies between and opposite the entrance to any alley in which such pipes, conduits, tunnels, wires or conductors are laid or in that portion of any street which intersects or crosses another street. (4) The doing of any underground work in such portion of any street that is not paralleled by an alley within 250 feet from either side thereof and where the space, unobstructed by trees or other underground work, between the lot and curblines, is less than four feet in width. (5) The prompt and complete compliance on the part of the various transportation and street railway companies with the obligations and conditions imposed upon such several companies by the terms of the ordinances under and by virtue of which they and each of them claim the right of operating cars within the town, and nothing in this subsection shall be construed as to be a waiver, restriction or granting of any right or as applying to the right-of-way of such several companies, as defined in the ordinances, so long as each right-of-way is paved, maintained and kept in good repair, as in the ordinances provided. (c) The space between the lot line and the curb shall not be used for the installation of any underground work, except service pipes, service conduits or service conductors, in any block in which there is in such space any excavation of any character.

(Ord. of 1-6-1930, § 26; Code 1958, § 32-74)