§ 4-13-3-1 — FLOODPLAIN DEVELOPMENT PERMIT

City Code of the City of Evanston, Illinois (Codified through Ordinance No. 39-O-26 enacted May 11, 2026. (Supp. No. 22, Update 1)) · Evanston City Code § 4-13-3-1

Corpus is an independent public-information project, not the official City of Evanston website. Stable reference: corpuslaw.us/code/e767a354-8d8f-447b-8787-773f72ac2f40

4-13-3-1. - FLOODPLAIN DEVELOPMENT PERMIT.

(A) No person, firm, corporation, or governmental body shall commence any development activities, including new construction, substantial improvements, and alterations of a watercourse wholly within, partially within or in contact with the floodplains until a floodplain development permit is obtained from the Floodplain Administrator. No permit shall be issued by the Floodplain Administrator until the requirements of this Chapter have been met. (B) No person, firm, corporation, or governmental body shall commence any development of a critical facility on land below the 0.2-percent annual chance flood elevation without first obtaining a development permit from the Floodplain Administrator. (C) A local floodplain development permit shall not be issued by the Floodplain Administer for development in a floodway without the applicant first obtaining a state floodway permit from IDNR/OWR, except as noted in Section 4-13-6. (D) The Floodplain Administrator shall review all proposed development by comparing field surveyed topography of the site to the FIRM and shall make interpretations, where needed, as to the location of the floodplain boundaries, floodway boundaries, and BFE. 1. Any development that is located on land below the BFE, located in the mapped floodway, or associated with a Zone AO or VE is subject to the requirements of this Chapter. A LOMA-Floodway (LOMR-FW) shall be required before issuing a floodplain development permit for land higher than the BFE if located within a mapped floodway. 2. Any development located on land below the BFE that was filled after the date of the site's first floodplain designation on a flood map is subject to the requirements of this Chapter. 3. Any development located on land below the BFE that is that is hydraulically connected to the floodplain, but not shown on the current FIRM, is subject to the provisions of this Chapter. 4. The Floodplain Administrator shall maintain documentation of the pre-existing ground elevation at the site and, if applicable, certification that this ground elevation existed prior to the date of the site's first FIRM identification in the floodplain. (E) If the development site is within a floodway or in a floodplain for which a detailed study has not been conducted, the floodplain development permit shall be referred to a P.E. under the employ or contract of the City for review to ensure that the development meets the requirements of this Chapter. (F) A floodplain development permit or approval shall become invalid unless the actual start of construction, for work authorized by such permit, is commenced within one hundred eighty (180) days after its issuance, or if the work authorized is suspended or abandoned for a period of one hundred eighty (180) days after the work commences. The Floodplain Administrator shall ensure that all development activities happen in a timely manner. All permitted work shall be completed within eighteen (18) months after the date of issuance of the permit or the permit shall expire. Time extensions, of not more than one hundred eighty (180) days each, may be granted, in writing, by the Floodplain Administrator. Time extensions shall be granted only if the original permit is compliant with this Chapter and the FIRM and FIS in effect at the time the extension is granted. (G) Letters of Map Revision. The Floodplain Administrator shall require a CLOMR prior to issuance of a development permit for proposed floodway encroachments that will cause an increase in the BFE; and proposed development which will increase the BFE by more than one-tenths (0.1) feet in riverine area where FEMA has provided a BFE but no floodway. Once a CLOMR has been issued, the development permit may be issued for site grading and structures necessary in the area of the map change to achieve the final LOMR. Upon completion, the applicant shall submit as-built certifications, as required by FEMA, to achieve a final LOMR prior to the release of final development permits. Review Subsection 4-13-8(C)(11) for the construction of buildings in any floodplain issued a LOMR based on fill. (H) Application. An application for a floodplain development permit shall be made on a form provided by the Floodplain Administrator. 1. The application shall be accompanied by drawings of the site, drawn to scale, showing property line dimensions and legal description for the property and sealed by a registered P.E., licensed architect or registered land surveyor; existing grade elevations, using the NAVD 88, and all proposed changes in grade resulting from excavation or filling; the location and dimensions of all existing and proposed buildings, additions to buildings, sewage disposal and water supply facilities; floodplain limits based on elevation or depth, as applicable; floodway limits, as applicable; location and dimensions of all structures, including but not limited to fences, culverts, decks, gazebos, agricultural structures, and accessory structures. 2. For all proposed buildings, the elevation of the lowest floor (including basement) and lowest adjacent grade shall be shown on the submitted plans and the development will be subject to the requirements of Section 4-13-8 of this Chapter. 3. The applicant must provide notice to all property owners abutting Lake Michigan within six hundred twenty-five (625) feet of the proposed project.

(Ord. No. 81-O-21, § 1, 8-9-2021; Ord. No. 96-O-21, § 1, 10-11-2021)