§ 4-13-5 — OCCUPATION AND USE OF FLOOD FRINGE AREAS
City Code of the City of Evanston, Illinois (Codified through Ordinance No. 39-O-26 enacted May 11, 2026. (Supp. No. 22, Update 1)) · Evanston City Code § 4-13-5
Corpus is an independent public-information project, not the official City of Evanston website. Stable reference: corpuslaw.us/code/5cbdb705-28d4-4284-8011-0c18a0229781
4-13-5. - OCCUPATION AND USE OF FLOOD FRINGE AREAS.
Development in and/or filling of the flood fringe will be permitted if protection is provided against the base flood by proper elevation, compliance with compensatory storage requirements, and other applicable provisions of this Chapter. No use will be permitted that adversely affects the capacity of drainage facilities or systems. Developments located within the flood fringe shall meet the requirements of this Section, along with the requirements of Section 4-13-8. (A) Floodway Permit. 1. All applicants must provide to the City copies of all other federal, state, and local permits, approvals or waivers that may be required for this type of activity. The City Engineer shall not issue a permit unless all other federal, state, and local permits have been obtained. All applicants must submit their application to the City within ten (10) business days of submitting an application to any other joint agency regarding the same subject matter. 2. Post-Construction Requirements. Upon completion of all construction, the City requires all applicants to submit to the City Engineer a copy of the final plat of survey. (B) Preventing Increased Damages. 1. No development in the flood fringe shall create a threat to public health and safety. 2. If fill is being used to elevate the site above the BFE, the applicant shall submit sufficient data and obtain a LOMR from FEMA for the purpose of removing the site from the floodplain. See Subsection 4-13-8(C)(11) for additional requirements. 3. Compensatory Storage. Whenever any portion of a floodplain is authorized for use, the volume of space which will be occupied by the authorized fill or structure below the BFE shall be compensated for and balanced by a hydraulically equivalent volume of excavation taken from below the BFE. a. The excavation volume shall be at least equal to one and one-half (1.5) times the volume of storage lost due to the fill or structure. b. In the case of streams and watercourses, such excavation shall be made opposite or adjacent to the areas so filled or occupied. c. All floodplain storage lost below the existing ten-percent annual chance flood elevation shall be replaced below the proposed ten-percent annual chance flood elevation. All floodplain storage lost above the existing ten-percent annual chance flood elevation shall be replaced above the proposed ten-percent annual chance flood elevation. d. All such excavations shall be constructed to drain freely and openly to the watercourse.
(Ord. No. 81-O-21, § 1, 8-9-2021; Ord. No. 96-O-21, § 1, 10-11-2021)
Ask a question about Evanston law
Corpus searches the Evanston sections it holds and shows the ones that match, with their citations. Free, no sign-in.
