For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-2B-2 — PLAT OF SURVEY:

Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 5-2B-2

Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/2c1272cf-127e-4743-be4d-e5b391bf765d

5-2B-2: - PLAT OF SURVEY:

A plat of survey prepared by a registered land surveyor shall be filed after the footings and the foundation wall have been poured. Said plat of survey shall locate and spot the foundation wall. No construction shall be continued on any building until the Department of Transportation, Engineering and Development approves the location of the proposed structure as being in conformance with all setback requirements provided for in the zoning regulations of this Code [4].

(Ord. No. 06-301, 12-19-2006, eff. 1-1-2007)

Ask a question about Naperville law

Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.