For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-2B-6 — SALES, OFFICE, OR CONSTRUCTION TRAILERS:

Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 5-2B-6

Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/c88de7dd-4776-4eb3-8d37-c4956f9b8b3a

5-2B-6: - SALES, OFFICE, OR CONSTRUCTION TRAILERS:

1. Definition: A "sales, office, or construction trailer" (hereinafter "trailers", except as otherwise specified) shall be defined as any temporary or movable trailer which is, was, or may be used for the storage of construction materials or tools, as shelter for workers, for supervising construction activity, for a sales office, or other office needed for the development of a site, and which is temporarily located at a site other than its permanent trailer location. 2. Regulations: The use of trailers in the City shall be subject to the following regulations: 2.1. Areas where trailers are located and access roads to such areas shall be overlaid with a minimum of four (4) inches of compacted gravel. 2.2. Trailers shall not be located within any public or private right-of-way nor shall they be located so as to interfere in any way with a public or private easement. 2.3. All areas where trailers are located shall be screened from abutting residential areas. 2.4. All trailers shall be located and maintained in accordance with a site plan approved by the Director of Transportation, Engineering and Development or their designee, or by the City Council in accordance with Subsection 5-2B-6.3 of this Section. 2.5. All trailer areas shall have a minimum of one dumpster for depositing refuse which shall be screened from abutting residential areas. The refuse in each such dumpster shall be removed periodically or as necessary to an appropriate waste disposal facility to prevent littering and the escape or removal of refuse by wind or other means. In addition, all trailer areas shall be policed on a regular basis to maintain the area in a neat and orderly condition. 2.6. All construction trailers shall be removed from the site when the last structure for which such trailers are permitted has been constructed and occupied, or six (6) months after the construction activity for which such trailers were permitted has substantially ceased, whichever occurs first. 2.7. All sales or office trailers used for the purpose of selling lots or homes shall be removed within thirty (30) days of receipt of approval for occupancy from the Department of Transportation, Engineering and Development for any model home within the subject development. 2.8. All construction trailers used solely for the storage of tools or materials for construction purposes shall be removed within fifteen (15) days after the construction activity for which such trailers were permitted has ceased. 2.9. All trailers shall be secured against unauthorized entry. 2.10. A five hundred dollar ($500.00) cash bond for each trailer shall be posted with the Director of Transportation, Engineering and Development or their designee to guarantee performance of these regulations by the holder of the trailer permit. Such bond may be used by the City, at the direction of the Director of Transportation, Engineering and Development or their designee, to enforce performance of these regulations. Prior to any such use of such bond, however, the Director of Transportation, Engineering and Development or their designee shall give written notice to the permit holder informing the permit holder of the violation that exists, the action necessary to correct the violation, the period of time during which the violation must be corrected, and the right of the permit holder to be heard regarding the violation alleged to exist and the proposed remedial action. 2.11. A permit holder, upon receiving notice of a violation as provided above, shall correct the violation as required within fifteen (15) days of the date of said written notice. Alternatively, the permit holder may request a hearing before the City Manager by delivering their written request for a hearing to the City Manager within fifteen (15) days of the date of said written notice. Upon receiving a request for a hearing, the City Manager shall set a date when the hearing will be held which shall be within ten (10) days of the request for such hearing, and they shall also set the time and place of such hearing. The City Manager shall advise the applicant of the date, time and place for such hearing in writing. The hearing shall be informal. The Director of Transportation, Engineering and Development or their designee shall state such facts as may be relevant to the alleged violation and the proposed corrective action. The permit holder shall have the right to question the Director of Transportation, Engineering and Development or their designee as to the alleged violation and corrective action and may also offer such further facts as may be relevant to the alleged violation and proposed corrective action. Based upon such facts, the City Manager shall determine whether a violation of these regulations exists and the remedial action, if any, that is appropriate. The decision of the City Manager as to the existence of a violation of these regulations and the necessary remedial action, if any, shall be final. In the event that the permit holder fails to request a hearing by the City Manager, or if the City Manager determines that a violation exists and that remedial action is appropriate, the Director of Transportation, Engineering and Development or their designee shall be authorized to use the posted cash bond to correct the violation as stated in said written notice or as otherwise determined by the City Manager. 3. Permits: 3.1. No construction trailer shall be located or used in the City without a permit issued for such trailer upon authorization of the City Council or Director of Transportation, Engineering and Development or their designee as provided below. 3.2. All permit applications shall be made by the developer of the area, builder, general contractor or other such person, firm or corporation having general charge or control of construction in the area or on the site for which such construction trailers are to be used. 3.3. All permit applications shall describe the development or building site for which the requested construction trailers are required, the number of trailers requested and the anticipated construction activity in such development or building site which requires the number of trailers requested. In addition, the permit application shall include a site plan indicating the proposed location of each trailer. 3.4. The Director of Transportation, Engineering and Development or their designee shall authorize the issuance of such construction trailer permits as are appropriate to meet the reasonable construction requirements of the permit applicant based upon the scope and schedule of applicant's anticipated construction activity, provided that all requirements of Subsection 5-2B-6.2 of this Section are totally complied with. Trailers used for the sale of merchandise or to house a use in a zoning district in which it is not permitted must be approved by the City Council. Also, any applicant who is unable to meet the requirements of Subsection 5-2B-6.2 of this Section, or who believes that the denial of their permit by the Department of Transportation, Engineering and Development was incorrect, may seek the approval of a permit by the City Council. 3.5. Upon authorization, payment of a twenty-five dollar ($25.00) permit fee and posting of the required cash bond, construction trailer permits shall be issued by the Department of Transportation, Engineering and Development. 3.6. Construction trailer permits issued pursuant to this Section shall be effective for a period not to exceed the duration of the active construction phase of the project for which the trailer is permitted, as determined by the Director of Transportation, Engineering and Development or their designee, and in accordance with Subsections 5-2B-6.2.6 through 5-2B-6.2.9 of this Section. 3.7. In addition to the fees provided herein, a fifty dollar ($50.00) fee shall be paid for temporary electric service to any such construction trailer, such fee being exclusive of all other fees or charges for the provision and usage of electric energy by the Naperville Department of Public Utilities.

(Ord. No. 84-90, 6-18-1984; Ord. No. 88-12, 1-18-1988; Ord. No. 96-47, 4-2-1996; Ord. No. 06-301, 12-19-2006, eff. 1-1-2007; Ord. No. 22-044, § 2, 5-3-2022)

Ask a question about Naperville law

Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.