5-9-4: - GENERAL PRINCIPLES:

It is the objective of this Chapter to control soil erosion and sedimentation resulting from development activities in the City. Measures taken to control erosion and sedimentation should be adequate to assure that sediment is not transported from the site by storm events of one-, five-, and ten-year frequency. The following principles shall apply to all development activities within the City and to the preparation of the submissions required under Section 5-9-5 of this Chapter. These principles shall be followed by the site engineer as part of the erosion and sedimentation control plan. 1. Site development should be planned so that it is consistent with and conforms to the topography and soils of the site so as to prevent and minimize soil erosion. Radical cuts and fills should be avoided in areas of steep slopes. Natural contours should be maintained as much as possible. 2. Natural vegetation should be retained and protected wherever possible. Areas immediately adjacent to natural watercourses should be left undisturbed wherever possible. 3. The area of land exposed during site development should be limited to the smallest working area practicable. The period of time during which land is exposed without vegetation should be limited to the shortest period practicable and should be during periods of the least intense rainfall. Stripping and excavation should be minimized. Vegetative cover should be restored at the earliest possible time. Large topsoil stockpiles and land removal of topsoil should be minimized. Topsoil stockpiles should be revegetated during periods of extended use. 4. Sediment basins, debris basins, desilting basins, or silt traps or filters should be installed and maintained to remove sediment from runoff waters from land undergoing development. 5. The selection of erosion and sedimentation control measures should be based on the probable frequency of climatic and other events likely to contribute to erosion, and on evaluation of the risks, costs, and benefits involved. 6. Aesthetics, public health and the requirements of continuing maintenance should be considered in the design and implementation of erosion control facilities and practices as part of an erosion and sedimentation control plan. 7. Provision should be made to accommodate the increased water runoff caused by changed soil and surface conditions both during and after development. Drainageways should be designed and constructed so that their final gradients and the resultant velocities of water will not create additional erosion on-site or beyond the project limits. 8. Permanent vegetation and hydraulic structures should be established and installed as soon as practicable during development.

(Ord. No. 87-19, 2-17-1987)