For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-9-5 — EROSION AND SEDIMENTATION CONTROL PERMIT:

Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 5-9-5

Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/a8cc9135-d304-4877-a75f-59c23db54a3e

5-9-5: - EROSION AND SEDIMENTATION CONTROL PERMIT:

1. Permit Required: Except as otherwise provided in this Chapter, no person shall commence or perform any removal, grading, clearing, stripping, excavating, filling or development on any site, parcel, or lot in any zoning district, without first obtaining an erosion and sedimentation control permit from the City. 2. Exceptions To Permit Requirement: A permit shall not be required for any of the following: 2.1. Development of a site, parcel or lot of less than two (2) acres in any zoning district; provided, that the person responsible for any such development shall implement necessary erosion and sedimentation control measures to satisfy the standards set forth in Subsection 5-9-5.5 of this Section. 2.2. Agricultural use of land, including the implementation of conservation measures included in a farm conservation plan approved by the appropriate soil and water conservation district, and including the construction of hydraulic structures. 2.3. Installation, renovation, or replacement of a septic system to serve an existing dwelling or structure subject to existing City and county ordinances, regulations and policies regarding same. 2.4. Repair work by utilities such as Northern Illinois Gas Company, Illinois Bell Telephone Company, cable television services, and the Naperville Department of Public Utilities, as long as such repair work involves a total ground area of two (2) acres or less and is performed in compliance with Subsection 5-9-5.5 of this Section. 3. Application For Permit: Application for an erosion and sedimentation control permit shall be made by the owner of the property or their authorized agent to the City Department of Community Development on a form furnished for that purpose. Each application shall bear the names and addresses of the owner and developer of the site and any person retained by the applicant as site engineer together with the name of the individual who will act as the principal contact for the site engineer. Each application shall include the applicant's agreement that any development of parcels shall be in accordance with erosion and sedimentation control plans approved upon issuance of the erosion and sedimentation control permit. Each application shall be accompanied by a fee of three hundred fifty-eight dollars ($358.00). 4. Erosion and Sedimentation Control Plans: Each application for an erosion and sedimentation control permit shall be accompanied by the following plans, data and information which, upon approval of the City Engineer and issuance of an erosion and sedimentation control permit, shall constitute the erosion and sedimentation control plans for the parcel. 4.1. A vicinity map for the site for which the permit is sought in sufficient detail to enable easy location in the field of the site, and including the boundary lines and approximate acreage of the site, existing zoning, and a legend and scale. A legal description of the site must also be provided. 4.2. A plan showing: 4.2.1. Existing topography of the site and adjacent land within one hundred (100) feet of the boundaries, drawn at no greater than one-foot contour intervals and clearly portraying the topography and drainage pattern of the area. 4.2.2. The location of existing buildings, temporary structures, utilities, water bodies, flood plains, hydraulic structures, paved areas and other significant natural or human-made features on the site and adjacent land within one hundred (100) feet of the boundary. 4.2.3. A general description of the predominant soil types on the site to a depth of intended excavation, their location, and their limitations for the proposed use. 4.2.4. Proposed use of the site, including present development and planned development and utilization; areas of excavation, grading, and filling; proposed contours, finished grades, and street profiles; provisions for storm drainage, including the control of accelerated erosion, with a drainage area map and computations; kinds and locations of utilities; and areas and acreages proposed to be paved, covered, sodded or seeded, vegetatively stabilized, or left undisturbed. 4.3. A plan showing proposed erosion and sedimentation controls: 4.3.1. All erosion and sedimentation control devices, structures or measures necessary to comply with the general principles of this Chapter and the standards set forth herein. The erosion and sedimentation control plan shall show all such devices, structures or measures to be employed temporarily during development of the parcel and to be employed permanently upon completion of development. These measures shall be shown on the detailed grading plan. 4.3.2. Seeding mixtures and rates, types of sod, method of seedbed preparation, expected seeding dates, type and rate of lime and fertilizer application, and kind and quantity of mulching for both temporary and permanent vegetative control measures. 4.3.3. Provisions for maintenance of erosion and sedimentation control devices, structures or measures, including easements and estimates of the cost of maintenance. 4.3.4. Identification of the person(s) who will have responsibility for maintenance of erosion and sedimentation control devices, structures and measures after development is completed. This identification should be shown on the permit application form. 4.3.5. As a minimum measure, staked hay bales or acceptable alternatives shall be properly placed around the frames of all open lid structures during construction to prevent sediment from clogging sewers and ditches and polluting or silting drainage facilities, watercourses or bodies of water. 4.3.6. The person(s) who will be responsible for the implementation and maintenance of temporary and/or permanent erosion and sedimentation control devices, structures or measures. 4.3.7. That the proposed erosion and sedimentation control plan is consistent with existing or planned development of other parcels which may be affected by, or which may affect, development of the subject parcel. 4.4. The proposed phasing/grading plans of development of the site, including stripping and clearing, rough grading, construction, final grading and landscaping. Documentation on plans should reflect phasing of such development activities and identify a schedule of expected dates on which each phase will begin, the estimated duration of each phase in numbers of days, including the estimated duration of exposure of stripped and cleared areas, and the sequence of stripping and clearing, installation of temporary and permanent erosion and sedimentation control devices, structures or measures, final grading, installation of hydraulic structures, paving streets and parking areas, and establishment of permanent vegetative cover. 5. Standards: The erosion and sedimentation control plan shall conform to and demonstrate compliance with the standards and requirements contained in Chapter 6, entitled "Design Procedures and Specifications", and Chapter 7, entitled "Runoff", in "Procedures and Standards for Soil Erosion and Sedimentation Control in Northeastern Illinois", prepared by the Northeastern Illinois Erosion and Sedimentation Control Steering Committee and adopted by the Kane/DuPage County Soil and Water Conservation District, dated October, 1981, which standards and requirements are hereby incorporated into and made a part of this Chapter by reference. 6. Agreement; Waiver: Application for an erosion and sedimentation control permit shall constitute the applicant's agreement to develop the site, parcel or lot in accordance with the requirements of this Chapter and the approved erosion and sedimentation control plan. Specific requirements under this Chapter for the content of the erosion and sedimentation control plan may be waived or modified in a written agreement approved by the City Council if the City Council first determines that development of the parcel in accordance with the erosion and sedimentation control plan submitted will conform with the general principles and purposes of this Chapter. 7. Bond Requirements: Prior to the issuance of an erosion and sedimentation control permit, the applicant shall submit a corporate surety bond or other financing surety containing substantially the provisions set forth in Section 7-1-6.1 of this Code to guarantee completion of the erosion and sedimentation control plan. 8. Review and Approval: Each application for an erosion and sedimentation control permit shall be reviewed and acted upon according to the following procedures: 8.1. After receiving an application, DCD shall refer the application to Department of Public Works. Department of Public Works will review each application for an erosion and sedimentation control permit to determine its conformance with the provisions of this Chapter. Department of Public Works may also refer any application which has not yet been so submitted to the appropriate Soil and Water Conservation District and/or any other government or public agency within whose jurisdiction the site is located for review and comment. Any additional fees incurred by such a referral shall be paid by the person applying for the permit. Department of Public Works' approval or disapproval of each application shall be submitted in writing to DCD. If Department of Public Works approves the application, DCD shall issue the permit. 8.2. An erosion and sedimentation control permit may be issued after approval of preliminary engineering plans for the site, parcel or lot and the submission of detailed final engineering plans, all in accordance with the applicable titles of this Code. All work undertaken by the applicant pursuant to the erosion and sedimentation control permit shall be subject to all modifications necessary to comply with the approved final engineering plans for the site, parcel or lot. By undertaking any work pursuant to the erosion and sedimentation control permit prior to approval of final engineering plans by Department of Public Works and any other government or public agency having jurisdiction of the site, parcel or lot, the applicant acknowledges and agrees that all modifications necessary to comply with approved final engineering plans or the requirements of such other government or public agency shall be performed and completed by the applicant at their sole cost and expense. 8.3. Department of Public Works shall approve the issuance of an erosion and sedimentation control permit upon submission, review and approval of an application, erosion and sedimentation control plans, and a bond, all as required by this Chapter. Furthermore, an erosion and sedimentation control permit may be issued only after approval of preliminary engineering plans for the site, parcel or lot and the submission of detailed final engineering plans, all in accordance with the applicable titles of this Code. Issuance of an erosion and sedimentation control permit shall not affect the applicant's obligation to obtain all permits or approvals required by any other government or public agency having jurisdiction of the site, parcel or lot. 9. Record Drawings: The applicant shall provide Department of Public Works with reproducible record drawings upon completion of the project in compliance with the procedures and standards established by the City Engineer. The City Engineer shall have the authority to establish written procedures and standards for the content, review and approval of record drawings for the purpose of establishing that projects have been completed in conformance with the requirements of this Chapter.

(Ord. No. 87-19, 2-17-87; amd. Ord. No. 92-137, 7-21-1992; Ord. No. 18-145, § 5, 12-18-2018; Ord. No. 22-044, § 2, 5-3-2022)

Ask a question about Naperville law

Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.