For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 5-2B-5 — SIDEWALK REQUIRED:

Municipal Code of Naperville, Illinois (Supp. No. 101: codified through Ordinance No. 26-049, adopted May 19, 2026) · Naperville Municipal Code § 5-2B-5

Corpus is an independent public-information project, not the official City of Naperville website. Stable reference: corpuslaw.us/code/641517eb-47f8-4a9a-a124-ce3198496a91

5-2B-5: - SIDEWALK REQUIRED:

1. Unless designated as a "no build" area in the comprehensive sidewalk policy, construction of a sidewalk, or payment of a fee in lieu of such construction as provided herein, shall be required for the construction of any new building or any addition to an existing building that increases the square footage of the building by greater than fifty percent (50%). Except as provided below, sidewalks shall be constructed whenever thirty percent (30%) or more of the total number of lots on the block fronting upon the same street side within that property's subdivision or development have sidewalks. For purposes of this Section, "block" is defined as: A geographic area within the City enclosed by streets or by a combination of streets, or by other demarcations, including, but not limited to, public parks, cemeteries, subdivision boundaries, and railroad rights-of-way. Where there are cul-de-sacs, a block shall include all lots having an address facing the cul-de-sac and bounded by the next cross street. When required as provided herein, sidewalks shall be constructed upon the public street or streets adjacent to the land described in the building permit application, according to the specifications required by the City applicable thereto. The location of such sidewalk shall be subject to approval by the City Engineer or their designee. 2. Except as provided below, whenever construction of a sidewalk is not required, in whole or part, a fee in lieu of construction of sidewalks shall be paid. The fee shall be established by the City Engineer based upon estimated cost of construction of such sidewalk at the time of permit issuance. This fee shall be paid before permit issuance. Fees paid shall be utilized as authorized by the City Council for construction and maintenance of sidewalks, bike paths and other nonmotorized vehicle paths within the City of Naperville. 3. The City Engineer may direct that a sidewalk be constructed for any property described in Subsection 5-2B-5.1 of this Section whenever the City Engineer determines that such sidewalk is needed to connect other existing sidewalk segments, or is otherwise necessary pursuant to the City's sidewalk plans for the affected area. In such case, no fee in lieu of construction shall be required to the extent sidewalks are constructed. The City Engineer may direct that a sidewalk not be constructed for any property described in Subsection 5-2B-5.1 of this Section whenever the City Engineer determines that such sidewalk is not needed to connect other existing sidewalk segments, or is otherwise contrary to the City's sidewalk plans for the affected area. In such case, a fee in lieu of construction shall be required to the extent sidewalks are not constructed. 4. For new subdivisions, property owners (developers) that have not completed construction on their lot(s) shall be required to install sidewalks for each phase or unit of the subdivision according to the following, whichever occurs first: 4.1. Within three (3) years of City Council's approval of the final plat of subdivision, or 4.2. Within one year of ninety percent (90%) build out of the defined subdivision by phase or unit.

(Ord. No. 03-104, 5-6-2003; Ord. No. 04-30, 3-2-2004; Ord. No. 22-044, § 2, 5-3-2022)

Ask a question about Naperville law

Corpus searches the Naperville sections it holds and shows the ones that match, with their citations. Free, no sign-in.